by
Downtown Spa
4:
PREPARATION OF THE INSTALLATION SITE
CONTINUED
A
Perimetric inspection compartment of 20” with
removable floor
B
Internal drainage grates.
C
Non-slip flooring is recommended.
D
Two Ø6“ vents to ensure proper ventilation of
the technical compartment.
BUILT-IN INSTALLATIONS
D
C
B
A
Inspection compartment details
Controls /
Installations side
NB:
Make sure the weight is supported
on the base and not on the edges.
We advice to fix the last line of tiles near the
edge once the installation is completed, the
result will be a good match between the hot
tub and the covering.
.25
7
58
“
20
“
20
“