Aquatique Thermo
installation instuctions
page 8
Carefully cut out the cardboard fixing
template provided, mark out the position
of the mouting ring. If required the
(194mm) inlet pipe centres may be used as
a guide to mark out the falling or rising
exposed pipework as appropriate to aid the
positioning of the pipe fixing clip locations.
1
Surface sited pipe work
Tighten the elbow locking screws using
2.5mm key provided. Slide the dummy nuts
into position and rotate them so the locking
screw is out of site before securing them
using the 2.5mm key.
Remove the mounting ring from the rear of
the valve using the 2.5mm hexagonal key
provided. Locate the ring inside the pre
marked position, ensuring the locking screw
is in the 6 o’clock position and mark the four
fixing holes.
2
Drill and prepare the fixings for the
mounting ring. Fix the mounting ring to the
wall using the screws provided.
3
Follow steps 6 to 13 listed above.
4
Tighten the inlet compression unions sufficiently to ensure a watertight seal.
Push the cover plates over the unions flush to the wall surface.
12
13