o
Riverside Business Park,Royd Ings Avenue,Keighley, West Yorkshire,BD21 4AF
01535 613830 Technical:01535 613830 Fax: 01535 613831
Page 1: ...The fitting instructions should be followed carefully to ensure a proper and safe installation Failure to follow these instructions could result in future injury These instructions and list of parts a...
Page 2: ...9 10 11 12 14 15 16 17 18 13 Screw M6x12 x2 x1 19 No Descrip on Qty No Descrip on Qty 1 Wall Pro le 1 11 Arm Rail 1 2 Wall Plug 3 12 Glass 1 3 Bolt 2 13 Fixing Screw M6x12 1 4 Fixing Screw ST 4x30 3...
Page 3: ...e with a spirit level then mark the position using a pencil through the 3 pre drilled screw holes in the wall profile drill the marked points using a 6mm masonry drill bit Once this is done insert 3 w...
Page 4: ...assembly onto the wall profile Diagram H Step 9 Drill 3 equally spaced holes with a 3mm drill bit through the wall profile into the frame Diagram I Step 10 Fix the bath screen assembly to the wall pro...
Page 5: ...ft downwards motion to release it from the rail holder Diafram O Lift the bottom rail to rotate it into the wall profile channel Diagram P then you can open close the bath screen P O Step 12 Silicone...
Page 6: ...o Riverside Business Park Royd Ings Avenue Keighley West Yorkshire BD21 4AF 01535 613830 Technical 01535 613830 Fax 01535 613831...