background image

with frequency converter

Invertec Optidrive E2)

1
2
3
4
5
6
7
8

37 

38 

Wiring diagram

Art. No. 081190

16  

AS Control Plus      02-2019 EN

Summary of Contents for AS Control Plus

Page 1: ...Operating Instructions AS Control Plus 2019 English ...

Page 2: ...0 C water temperature in Switzerland we were able to demonstrate an energy saving of more than 20 000 kW equivalent to 2 000 litres of oil in a six month period May to October Suction Overflow tank Suction pool Main drain Suction pool Auto Overflow protection Top up solenoid valve Run dry protection Cover closed ON FAULT Backwash aktive Suction Overflow tank Level probes Overflow tank Operating ke...

Page 3: ...ckwas from the pool or the overflow tank 6 Energy efficiency control economy or overflow Operation 7 Shortcut for starting a backwash and changing the heating setpoint 8 All data for the previous ten month period are stored These can be downloaded onto a PC for analysis 9 Optional flow control with a paddle switch Technical data Connectors 78 connectors for inputs and outputs Relays 13 relays Elec...

Page 4: ...re is a large amount of heat loss evaporation convection During operation with the pool covered open the pool water has to be circulated via the overflow 2 Economy mode In so called economy mode water is drained directly from the pool i e from one or more drains Pool pump pool Thus the water no longer flows via the overflow The heat loss is reduced considerably Economy mode is best suited to perio...

Page 5: ...nage will take place directly via the pool economy mode or via the overflow channel As soon as the pool cover is opened the system goes into overflow mode The limit switch must be connec ted to terminals 71 72 2 Main drain operation economy mode The Besgo valve is always in the economy mode and drainage is via the main drain irrespective of temperature and whether the pool cover is open or closed ...

Page 6: ...the overflow for at least 30 to 60 minutes per day Only in this way can you measure and control the water level the measurement takes place in the overflow tank Additionally the correct water flow via the overflow channel will be re established by entering the times for the overflow operation which will ensure proper circulation within the pool With public pools we recommend switching to over flow...

Page 7: ... the day of the week changed or an interval of 1 to 30 days between backwash cycles chosen by means of the arrow keys BACKWASH VIA factory setting overflow tank By pressing the OK key you can select by means of the arrow keys whether the backwash takes place via the overflow tank or the main drain DELAY STOP VIA OVERFLOW factory setting 30 minutes After every backwash there is a compulsory flow vi...

Page 8: ...e blue display panel OVERFLOW TANK MENU MAIN DRAIN AT DRY RUN PROTECTION Factory settings OFF The Besgo valve switches to main drain to avoid stopping the filtration pump because dry running empty overflow tank By pressing the OK key you can select this function ON and OFF By pressing the OK key you can select whether overflow operation is triggered when a specific ambient air temperature is reach...

Page 9: ...EMPERATURE CORRECTION By pressing the OK key you can adjust by means of the arrow keys the actual air temperature shown in the blue display by up to 10 C to 10 C This fine adjustment is useful when there is a difference between the measured and actual pool temperature due to the positioning of the temperature probe TEMPERATURE PROBE AIR factory settings ON By pressing OK you can enable or disable ...

Page 10: ...r on the pool closed limit switch contact Priorities The overflow filter time always has priority over other actions This means that when the unit is operating via the main drain in economy mode and the overflow filter times are active the controls switch to normal operation With the same objectives the following priorities are active Im gleichen Sinn sind folgende Prioritäten vergeben 1 Overflow ...

Page 11: ...02 2019 EN AS Control Plus 11 Caution Only 1 filter pump can be connected 230 VAC or 400 VAC Wiring diagram Art No 081190 ...

Page 12: ...Badu Prime Art No 034110 with Speck Badu Delta Art No 034113 with Speck Badu Profi Art No 034101 with Speck Badu Alpha Art No 034112 Backwash 36 37 Filter operation via Overflow tank Filter operation via main drain Wiring diagram Art No 081190 ...

Page 13: ...entair IntelliFlow VSD and control IntelliCommII Art No 034001 Art No 034006 Level 4 Level 3 Level 2 Level 1 Wiring diagram Art No 081190 Wiring diagram Wiring diagram 02 2019 EN AS Control Plus 13 10 9 8 7 6 5 4 3 ...

Page 14: ...with pump UWE EO PM Art No 037000 Control cable GND Wiring diagram Art No 081190 14 AS Control Plus 02 2019 EN ...

Page 15: ...with frequency converter AS ATV 212 Art No 036120 036129 F R RES PLC P24 CC FM PP VIA VIB CC Wiring diagram Art No 081190 02 2019 EN AS Control Plus 15 ...

Page 16: ...with frequency converter Invertec Optidrive E2 1 2 3 4 5 6 7 8 37 38 Wiring diagram Art No 081190 16 AS Control Plus 02 2019 EN ...

Page 17: ...17 AS Control Plus 02 2019 EN Menu layout with ...

Page 18: ...02 2019 EN AS Control Plus 18 ...

Page 19: ......

Page 20: ......

Reviews: