Aqua-Hot™ Hydronic Heating System Installation Manual 07/05
Page 53
Pressure the Aqua-Hot
Heating System to 15 PSI,
then, allow the air pressure
to remain for 30 minutes
and check for loss of
pressure.
Should a loss of pressure
occur, check the connections
at each Heat Exchanger using
a soapy water solution, and
watch for bubbles to appear,
which indicates an air leak.
Figure 33
SECTION 3: INSTALLATION PROCEDURES