Aqua Computer Aquaduct 240 PRO Operating And Assembly Manual Download Page 1

AQUADUCT

Operating and assembly manual

Operating and assembly manual

Operating and assembly manual

Operating and assembly manual

mark III ceramic

mark III ceramic

mark III ceramic

mark III ceramic

240 PRO, 360 XT and 720 XT

August 2009

© 2007-2009

Aqua Computer GmbH & Co. KG

- 1 -

Gelliehäuser Str. 1, 37130 Gleichen, Germany

aquaduct

Summary of Contents for Aquaduct 240 PRO

Page 1: ...manual Operating and assembly manual Operating and assembly manual mark III ceramic mark III ceramic mark III ceramic mark III ceramic 240 PRO 360 XT and 720 XT August 2009 2007 2009 Aqua Computer Gm...

Page 2: ...ocket 754 939 F 13 6 4 Installation of 3 nose mounting kits Socket 370 A 14 6 5 Examination and connection to the cooling system 15 6 6 Proper connection of the cuplex PRO hd and XT di 15 7 Installati...

Page 3: ...bout the aquaduct The aquaduct is an an uncompromising solution It has convincing design and a cooling performance which sets standards at a minimum noise level Furthermore it is foolproof to handle s...

Page 4: ...thout draining the system In contrast to self closing couplers the ball valve do not restrict water flow In addition to the electronic monitoring features of the aquaduct 360 XT and 720 XT models all...

Page 5: ...ears or earlier if the cooler is frequently dismantled The threaded hose connections of the plug cool system are made watertight with real rubber gaskets They can be re placed later the same way as th...

Page 6: ...the cessary to pass hoses inside the case The holes in the bracket of the cessary to pass hoses inside the case The holes in the bracket of the cessary to pass hoses inside the case The holes in the b...

Page 7: ...tion of this product can reasonably devices or systems where malfunction of this product can reasonably devices or systems where malfunction of this product can reasonably devices or systems where mal...

Page 8: ...XT mark III 3 2 aquaduct 360 XT mark III 3 2 aquaduct 360 XT mark III 3 2 aquaduct 360 XT mark III aquaduct 360 XT 2 pcs straight connector plug cool G1 8 2 pcs ball valves actuation with bolt allen...

Page 9: ...ct mark III and aquaduct 720 XT 720 XT 720 XT 720 XT aquaero power connect 24 pin ATX standby power ATX break or der code 53047 temperature sensor order code 53026 plug cool temperature sensor order c...

Page 10: ...and cleanly avoiding avoiding avoiding avoiding burs burs burs burs with a sharp knife or a hose cutter available in our shop After each detachment of the hose from a connector the first two centimete...

Page 11: ...ion of the CPU waterblock cuplex series 6 Installation of the CPU waterblock cuplex series 6 1 Preparing the installation of the CPU cooler 6 1 Preparing the installation of the CPU cooler 6 1 Prepari...

Page 12: ...Should be more than four feathers included in the screw set please use the four softer feathers With the so called four hole mounting kit the cuplex is fixed directly on the motherboard with four scre...

Page 13: ...u can check this by sliding a piece of paper between the coils as illustrated on the photo If this is not possible you fastened the knurled bolts too much and you have to loosen them Also make sure th...

Page 14: ...ow insert the pressure springs into the metal sheets above the lid as shown on the picture The cooler can be moun ted onto the core of the processor now which should already be pre pared with heat con...

Page 15: ...elerate the flowing water and provide a better heat transfer For both cooler variants the water is then led out through the lateral connection In order to attain the full performance of the waterblock...

Page 16: ...ble check the po larity of the plug if having trouble to con nect 7 2 Connector pump rpm signal 7 2 Connector pump rpm signal 7 2 Connector pump rpm signal 7 2 Connector pump rpm signal This connector...

Page 17: ...uct 360 XT and 720 XT only alarm relay aquaduct 360 XT and 720 XT only alarm relay aquaduct 360 XT and 720 XT only alarm relay aquaduct 360 XT and 720 XT only Please refer to the manual aquaduct contr...

Page 18: ...It is not not not not a PC stand ard connection The USB interface of the aquaduct can be connected with the PC to configure the integrated control unit of the aquaduct using the aqua suite software A...

Page 19: ...the left turn the right one to the right until they stop When both valves are closed the levers stand in line Opening is made by turning the levers into the origin position The open condition is indic...

Page 20: ...s not get lost and lies correctly in its seal bed again after filling Important Important Important Important The coolant must be filled into the right aluminum profile seen from the front Otherwise i...

Page 21: ...e slowly until water flows back into the right profile via the bridge Refill coolant until the left profile is completely filled and only 2 3 cm about 1 inch of air remains in the right profile then r...

Page 22: ...the left profile you can see a red ball which swims upwards when switching on the aquaduct The ball is driven up by a side flow of the coolant This ball must not be visible during operation of the sy...

Page 23: ...e originally set frequency ist restored 13 Maintenance and care instructions 13 Maintenance and care instructions 13 Maintenance and care instructions 13 Maintenance and care instructions Regularly ch...

Page 24: ...s for all Plexiglas components Care instructions for all Plexiglas components Care instructions for all Plexiglas components Never use solvents Never use solvents Never use solvents Never use solvents...

Reviews: