AQC MAXIREACH-BD Owner'S Manual Download Page 6

Pivoting Extension Boom

6

  8  INSTALLATION

WARNING!

Installation of equipment must be performed as per local 

building laws and regulations. Structure must meet proper 

weight support of arm and equipment. Booms are required 

when a component is to be used at a distance from a wall 

or column. The loading on the structure or column must be 

know.

  7  COMPONENTS

 1.

  Boom base

 2.

  Flexible hose connection to main exhaust duct (hose clamps included)

 3.

  Boom base pivot joints

 4.

  Horizontal steel tube

 5.

  Horizontal steel tube support frame. Angle iron plate for 5' booms, 2" x 2" tubing for booms 

longer than 5'

 6.

  Flexible hose to bracket

 7.

  Ducting system spiral pipe

 8.

  MAXAIR fume arm or MAXIDROP hose drop bracket

2

3

4

5

6

8

7

1

Summary of Contents for MAXIREACH-BD

Page 1: ...tion use and maintenance This manual is property of the owner Leave with the unit when set up and start up are complete AQC Dust Collecting Systems inc reserves the right to change design and specific...

Page 2: ...n and purpose 5 7 Components 6 8 Installation 6 8 1 Inspection of goods 6 8 1 Inspection of goods 7 8 2 Location 7 8 3 Assembly 7 8 4 Required tools 7 8 5 Assembly boom base pivot 8 8 6 Assembly of op...

Page 3: ...using the system will have to trained on safety measures and maintenance instructions 2 INFORMATION ON THE MAXIREACH BD EXTENSION SWING BOOM Model Serial number Delivery date Date of installation Nam...

Page 4: ...for exhaust duct connection Support bracket at end of boom for MAXAIR fume arm or MAXIDROP hose drop system 3 steps paint finish degreasing prime coat and polyurethane final coat The MAXIREACH BD swin...

Page 5: ...into position for source capture to vacuum dust or smoke laden air into the attached equipment such as the MAXAIR fume arm Particles are vacuumed into the equipment toward an exhaust fan and into a d...

Page 6: ...a distance from a wall or column The loading on the structure or column must be know 7 COMPONENTS 1 Boom base 2 Flexible hose connection to main exhaust duct hose clamps included 3 Boom base pivot joi...

Page 7: ...ube until all equipment is installed It is advised to use a work platform at horizontal steel tube level to perform work around the unit Lifting device will be required for final adjustment and to lev...

Page 8: ...o pivot joint boom base pivot support bracket Remove friction disks and steel pins from boom base pivot brackets 4 Slide horizontal steel tube pivot sections into boom base pivot brackets 5 Insert 1 f...

Page 9: ...s such as overhead cranes light fixtures etc Usage of elbows or bends are allowed 2 Connect exhaust ductwork to fan outlet Refer to MAXIDRIVE installation manual 9 START UP 9 1 Check list Prior to sta...

Page 10: ...movement Weekly Flexible hoses Ensure hose clamps are secured Check for cracks or tears in fabric Replace if necessary Yearly All components Check sturdiness of support base installation Check wear on...

Page 11: ...ty customer must notify Seller in writing of the Product defect which notice shall include a reasonable description of the defect within 10 days from the date such defect is discovered or ought to hav...

Page 12: ...ssibility of such damages or could have reasonably foreseen them 13 3 Fire and Explosion and Acceptance of Risk Customer acknowledges that improper installation or use of the Product may result in fir...

Reviews: