  5  NORMAL USE

The MAXIREACH-BD swing boom is designed to remove fumes, gases or dust from the air resulting 

from  a  fabrication  process.  Each  MAXIREACH-BD  swing  boom  is  built  as  per  the  criteria  and 

information supplied by the customer for a specific application and should not serve any other 

application without the approval of A.Q.C. Inc.

  6  OPERATION AND PURPOSE

During normal operation, the MAXIREACH-BD swing boom is pulled or pushed into position for 

source capture to vacuum dust or smoke laden air into the attached equipment such as the 

MAXAIR fume arm. Particles are vacuumed into the equipment toward an exhaust fan and into a 

dust collector or exhausted outside (when permitted).

The 

Maxireach

 

swing boom is shipped partly

 

assembled but requires minimal final field

 
assembly. Because of carrier restrictions, swing

 

booms horizontal steel tubes longer than 10’ 
(3 meters) are shipped in two (2) pieces.
A joiner with fasteners is included for field

 

assembly.

METAL SLEEVE (SECURE WITH METAL 

SCREWS AND DUCT TAPE OR SILICONE FOR 

MINIMAL AIR LEAKS)

WELDED JOINER ON FIRST 

 

HORIZONTAL BEAM

ALIGN BOLT HOLES ON SECOND

 

BEAM WITH HOLES ON JOINER

HORIZONTAL SUPPORT TUBES

JOINER WITH FASTENERS

Summary of Contents for MAXIREACH-BD

Page 1: ...tion use and maintenance This manual is property of the owner Leave with the unit when set up and start up are complete AQC Dust Collecting Systems inc reserves the right to change design and specific...

Page 2: ...n and purpose 5 7 Components 6 8 Installation 6 8 1 Inspection of goods 6 8 1 Inspection of goods 7 8 2 Location 7 8 3 Assembly 7 8 4 Required tools 7 8 5 Assembly boom base pivot 8 8 6 Assembly of op...

Page 3: ...using the system will have to trained on safety measures and maintenance instructions 2 INFORMATION ON THE MAXIREACH BD EXTENSION SWING BOOM Model Serial number Delivery date Date of installation Nam...

Page 4: ...for exhaust duct connection Support bracket at end of boom for MAXAIR fume arm or MAXIDROP hose drop system 3 steps paint finish degreasing prime coat and polyurethane final coat The MAXIREACH BD swin...

Page 5: ...into position for source capture to vacuum dust or smoke laden air into the attached equipment such as the MAXAIR fume arm Particles are vacuumed into the equipment toward an exhaust fan and into a d...

Page 6: ...a distance from a wall or column The loading on the structure or column must be know 7 COMPONENTS 1 Boom base 2 Flexible hose connection to main exhaust duct hose clamps included 3 Boom base pivot joi...

Page 7: ...ube until all equipment is installed It is advised to use a work platform at horizontal steel tube level to perform work around the unit Lifting device will be required for final adjustment and to lev...

Page 8: ...o pivot joint boom base pivot support bracket Remove friction disks and steel pins from boom base pivot brackets 4 Slide horizontal steel tube pivot sections into boom base pivot brackets 5 Insert 1 f...

Page 9: ...s such as overhead cranes light fixtures etc Usage of elbows or bends are allowed 2 Connect exhaust ductwork to fan outlet Refer to MAXIDRIVE installation manual 9 START UP 9 1 Check list Prior to sta...

Page 10: ...movement Weekly Flexible hoses Ensure hose clamps are secured Check for cracks or tears in fabric Replace if necessary Yearly All components Check sturdiness of support base installation Check wear on...

Page 11: ...ty customer must notify Seller in writing of the Product defect which notice shall include a reasonable description of the defect within 10 days from the date such defect is discovered or ought to hav...

Page 12: ...ssibility of such damages or could have reasonably foreseen them 13 3 Fire and Explosion and Acceptance of Risk Customer acknowledges that improper installation or use of the Product may result in fir...