4–14
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 4. Installing the Base Station ODU Radio and Antenna
4.1 Grounding the PacketMax System
Aperto provides:
Two Surge Suppressors for PacketMax IF Cables
Two Grounding Cables
Two Grounding Lugs
Grounding of the outdoor radio/antenna and the base station is an essential part of
the installation process. A proper grounding circuit is illustrated in
.
Figure 4-1
Grounding the PM 3000 System (IDU, Radio, and Antenna)
Make sure that the:
IDU is grounded - (Refer to
Ground the Base Station and both the surge suppressors
section)
ODU is grounded - (Refer to
Attach Bracket and Grounding Wire to BSR
Surge Protectors are grounded (Refer to
Ground the Base Station and both the
section).
Antenna is grounded
CGND
Summary of Contents for PacketMAX 5000
Page 10: ...Preface Preface vi PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 14: ...Table Of Content TOC 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 146: ...E 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter E Certifications ...
Page 150: ...F 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter F Troubleshooting ...