![Applent Instruments AT516 User Manual Download Page 7](http://html.mh-extra.com/html/applent-instruments/at516/at516_user-manual_2954881007.webp)
7
Unpacking and Preparation
1.
Unpacking
and
Preparation
This chapter describes how to set up and start the AT516x DC Resistance Meter.
Incoming Inspection
Power Requirements
Setting up the Fuse
How to Remove the Handle
Environmental Requirements
Cleaning
1.1
Incoming
Inspection
After you receive the instrument, carry out checks during unpacking according to the
following procedure.
WARNING
If the external face of the instrument (such as the cover, front/rear panel, LCD screen,
power switch, and port connectors) appears to have been damaged during transport, do
not turn on the power switch. Otherwise, you may get an electrical shock.
Make sure that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
Referring to <Packing List> in the packing box, check that all packaged items supplied
with the meter have been provided as per the specified optioned.
NOTE
If an abnormality is detected, contact the company and transport the meter to your
nearest Applent Instruments sales or service office. For inspection by the transport
company, save the packing box, shock-absorbing material, and packaged items as you
received them.
1.2
Setting
up
Fuse
~Line: 110VAC/220VAC, 50Hz/60Hz
Fuse: 250V 1A Slow Blow
Please use the following fuse type.
UL/CSA type, Slow-Blow, 5
×
20-mm miniature fuse, 1A, 250 V
When you need a fuse, contact your nearest Applent Instruments sales or service office.
To verify and replace the fuse, remove the power cable and pull out the fuse holder.
1.3
Environmental
Requirements
Set up the AT516x where the following environmental requirements are satisfied.
Operating Environments
Ensure that the operating environment meets the following requirements.
Temperature: 0
C to 55
C
Temperature range at calibration: 23
C
±
5
C (<1
C deviation from the temperature
when performing calibration)