10
10
Wiring Instructions
STEP 2.
Connect the two ring terminals on the connector end of the cable to the battery. The battery
charger or solar panel should be installed at this time.
Plug the connector into the Master connector on the circuit board.
STEP 1.
Determine which direction the gate will open. The factory units are plugged into
INPUT B
for right hand opening as shown in
Fig. 1
.
For left hand opening, disconnect from INPUT B and plug into
INPUT A
on the surge board as
shown in
Fig. 2
.
Fig. 1
Right Hand Opening
Fig. 2
Left Hand Opening
Right Side Installation
Red
Black
Green
Orange
White
Left Side Installation
Red
Black
Green
Orange
White