2
Components included with the RO-PH90 system:
Make sure you have all these parts before starting installation.
1 RO system head
with pre installed membrane
3 Pre-filters in 3 Housings
1 Storage tank
Installation kit includes:
1 Feed water adaptor
3/8”- 1/2”
with needle valve kit
1 Drain saddle for waste water
2 Color tubing 1/4”
1 Tank’s Ball Valve
2 Wrenches
for opening filter and
Membrane housing
Recommended: Please keep both wrenches near
or on the RO unit for future maintenance.
1 Faucet with tubing,
washers and nuts
(Faucet color may vary,
depends on the color selected)