1.
Place the ion bar in the work area where static electricity is to be eliminated and the installation angle is perpendicular to the surface of the charged
body. The working frequency and installation distance can refer to the following table according to the respective electrostatic safety and process
control requirements. (
Ex-work setting is 55Hz
, which can basically meet discharge demand within 100mm.)
Working frequency(Hz) Discharge distance(mm)
55
35
30
50
10
70
5
100
Installation position
≥ 300mm
≥ 300mm
Packing accessories
Three-core high-flexible power
cord with aviation plug
AP4855000
Standard 1.5m
(
Customizable on site
)
Square nut
AP8933000
M5*12*12*4
Needle seat
AP6620003
——
Infrared remote control
(
4 button
s
)
AP2253006
AP-AB1225 3 gears of voltage adjustment
Installation distance
Discharged object
2. Ion bar strip grounding electrode is not allowed to be covered by other objects.
3. Two ion bars should be installed side by side with an interval of more than 300mm.
4. More than 200mm away from obstacles such as walls.
5. Ion bar should be at least 30mm away from the metal conductor and metal grounding body around the electrode and the bar body must be reliably
connected to the ground wire.
6. The mounting
a
ngle of ion bar can be adjusted.
WALL
WALL
WALL
WALL
Metal conductor
Metal conductor
Metal conductor
Metal conductor
Part name
Picture
Part No.
Specification