background image

1.

 

Place the ion bar in the work area where static electricity is to be eliminated and the installation angle is perpendicular to the surface of the charged

 

body. The working frequency and installation distance can refer to the following table according to the respective electrostatic safety and process

 

control requirements. (

Ex-work setting is 55Hz

, which can basically meet discharge demand within 100mm.)

Working frequency(Hz) Discharge distance(mm)

55

35

30

50

10

70

5

100

Installation position

≥ 300mm

≥ 300mm

Packing accessories

Three-core high-flexible power 

cord with aviation plug

AP4855000

Standard 1.5m

Customizable on site

Square nut

AP8933000

M5*12*12*4

Needle seat

AP6620003

——

Infrared remote control

4  button

s

AP2253006

AP-AB1225 3 gears of voltage adjustment

Installation distance

Discharged object

2. Ion bar strip grounding electrode is not allowed to be covered by other objects.
3. Two ion bars should be installed side by side with an interval of more than 300mm.

4. More than 200mm away from obstacles such as walls.

5. Ion bar should be at least 30mm away from the metal conductor and metal grounding body around the electrode and the bar body must be reliably

connected to the ground wire.

6. The mounting 

a

ngle of ion bar can be adjusted.

WALL

WALL

WALL

WALL

Metal conductor

Metal conductor

Metal conductor

Metal conductor

Part name

Picture

Part No.

Specification

Summary of Contents for AP-AB1225

Page 1: ...AP AB1225 Intelligent Static Removal Ion Bar High speed Self balancing Hi Shanghai Anping Static Technology Co Ltd...

Page 2: ...control Button function instructions Function adjustment Symbol Operation instructions Ink splashing occurs on printing plate D C Press unlock D first then press C Ink accumulation on metal nozzles D...

Page 3: ...itive high voltage Positive high voltage Negative high voltage Negative high voltage Positive voltage working time Positive voltage working time Negative voltage working time Negative voltage working...

Page 4: ...ironment and stay away from static electricity Test standard ANSI ESD STM3 1 SJ T 11446 2013 Test instrument Trek charge plate tester Test voltage 1000V 100V attenuation Test environment humidity 50 5...

Page 5: ...een light Normal Blue light Standby Blue light flashing Debugging cleaning Red light Abnormal high voltage No 5 Features Safe Easy to use Durable Discharge part easy to replace Twist the needle holder...

Page 6: ...V high flexible towline power cord Air block head closed when not in use 200mm 225mm 250mm 275mm 300mm DC24V high flexible towline power cord wiring diagram Power cord color Connecting information Ora...

Page 7: ...m Ion balance 30V AVG Discharge time 1S Test distance 100mm Status indicator Cleaning time Default 15 days Working temperature 0 50 Working humidity 70 Dimensions L W H 200 225 250 300mm Needle spacin...

Page 8: ...icator light green shows ion bar working normally 3 Performance can be adjusted by special ink jet printing remote control 4 Step of use Adjustable mounting bracket Products Use Step of use Installati...

Page 9: ...5000 Standard 1 5m Customizable on site Square nut AP8933000 M5 12 12 4 Needle seat AP6620003 Infrared remote control 4 buttons AP2253006 AP AB1225 3 gears of voltage adjustment Installation distance...

Page 10: ...o factory for maintenance 6 Return to factory for maintenance Return to factory for maintenance Main board chip is damaged caused by poor grounding or no grounding 7 High voltage module is damaged or...

Page 11: ...charge within one year from the date of purchase However this commitment does not apply to 1 The device is incorrectly used or installed 2 Damage caused by negligence or accident during use 3 Modifie...

Page 12: ...g analysis and elimination solution provider Speciality Creates Value AP T Shanghai Anping Static Technology Co Ltd Tel 86 21 64517676 Fax 86 21 64517673 Postcode 200233 Website www ap static com Addr...

Reviews: