background image

AP-AB1207 has undergone rigorous testing and aging treatment before ex-work. Its performance has completely reached the 

relevant indicators marked in the usage instruction.

1. AP&T makes a commitment to the customer that any defective parts inspected by AP&T will be repaired or replaced free of charge

within one year from the date of purchase. However, this commitment does not apply to:

(1) The device is incorrectly used or installed.

(2) Damage caused by negligence or accident during use.

(3) Modified, disassembled or repaired by other service departments not authorized by Anping Company.

2. The alloy electrode is a consumable product which is not included in the scope of warranty and will be charged for replacement when

repairing.

3. AP&T shall not be liable for any incorrect use of the products except for repair or replacement of parts as specified above.

After-sales service

1. The ion bar should be cleaned and maintained in time according to the use environment and the required electrostatic protection 

requirements in order to ensure the good performance of the product. That is, gently remove the carbon deposits on the discharge 

electrode, discharge socket, and metal discharge body with electrostatic brush, dust-free cotton swab, dust-free cloth dipped in 

anhydrous alcohol, which will improve its performance significantly. Note:

A. Operation must be done 10 minutes after power cut off.

B. It must be cleaned when dust or white products appear on the tip of the needle during use. Use dust-free cloth dipped in anhydrous 

alcohol to clean when brush can not meet the cleaning requirements.

C. The ion bar must be powered on after alcohol is completely volatilized after cleaning. No other organic solvent can be used to clean 

the ion bar.

2. If the switch working indicator light of the power plug-in port on the panel of the ion bar is off , it should be stopped and repaired by 

professional maintenance personnel. It can be used only after the electrical performance index is normal.

Maintenance

NO.

Faults

Reasons

Solutions

1

The RJ45 power port indicator 

on the front panel is off

Poor contact of the power cable

Power supply mismatch

Check whether the power cable is in good condition and  securely 

connected

No power supply and the left port green power indicator is off

Check the power supply line

No communication connection or communication failure, the orange 

communication connection indicator on the left port is off

Check communication connection and software setup

Wrong working mode -- Only green light on at the right port (positive 

high voltage only)

Unplug the power cord and restart the ion bar. Or reset the working 

frequency (this lamp is not used to judge the failure of the high 

voltage module)

Wrong working mode -- Only orange light on at the right port (negative 

high voltage only)

The duty ratio is too small and the green light is dark

Adjust duty ratio until ion balance becomes good. Return to factory 

for repair if adjustment is not effective.

The duty ratio is too high and the orange light is dark

2

The electrostatic removal 

performance decreased 

obviously

Discharge needle is polluted and damaged

Clean or replace the discharge needle

Whether the discharge seat is tightened

Confirm the discharge seat is tightened

Ion bar positioning is incorrect

Confirm the best installation location

3

There are conductors or other ion bar around 

4

High voltage alarm

Panel indicator red light 

on 

Electromagnetic interference

Remove (moving) conductors or other ion bar

Abnormal discharge

No power supply for high voltage module

High voltage module is damaged

Return to factory for maintenance

5

Unable to discharge

High voltage module is damaged

Main-board chip is damaged

Return  to  factory  for  maintenance  

Return to factory for maintenance

Main-board chip is damaged caused by poor grounding or no grounding

6

High voltage module is damaged or insulation of the discharge seat is 

damaged

The product is smoky or burnt 

The electrostatic removal

performance decreased

Check the grounding of the ion bar and plant equipment, and return to  

factory for maintenance
Return to factory for maintenance

Confirm the power supply specification

INPUT

100—240VAC 

50/60Hz

OUTPUT

24VDC 2000mA

Turn off the power switch / unplug the power cable, restart the ion bar

Confirm the installation location and stay away from surrounding 

conductors

Return to factory for maintenance

Trouble shooting

Summary of Contents for AP-AB1207

Page 1: ...AP TR High Efficient Electroshock proof Intelligent Ion Bar AP AB1207 Shanghai Anping Static Technology Co Ltd AP T...

Page 2: ...nt adhesion of objects Static removal Prevent uneven scattering Control ink splashing Prevent sticking Widely used in printing UV flatbed industry Effectively solve the problem caused by static electr...

Page 3: ...Safe Static removal High efficient...

Page 4: ...plied to different discharge distance to achieve faster discharge speed HV voltage Positive high Positive voltage working time Negative voltage working time HV Negative high voltage HV Positive high v...

Page 5: ...ff and restart to restore the set time The cleaning function becomes invalid if the value is set to 0 days Adjust frequency FREQ Press FREQ first then press to increase or decrease the frequency of po...

Page 6: ...pressure HV Negative high pressure The pulsed AC method alternately applies and high voltage to one electrode needle to generate two polar ions Compared with the AC method the ion generation efficienc...

Page 7: ...ws test distance 100mm ion bar length 410mm working frequency 30Hz Test data under other conditionsare as follows Ion bar length 410mm working frequency 30Hz Test distance mm Discharge speed Positive...

Page 8: ...tion against electroshock Working status visualization Red light alarm when high voltage abnormal CE certification It can effectively prevent the external electromagnetic interference from affecting t...

Page 9: ...et size drawing 304 stainless steel three combination M5 pan head cross bolt with flat spring pad Details Parameter Size Specification Product Size Positive and negative high voltage indicator light f...

Page 10: ...30V AVE Discharge speed 1S Test distance 100mm Status indicator Green light normal Blue light standby Blue light flashing debugging cleaning Red light Abnormal high voltage Working temperature 0 50 W...

Page 11: ...able Positive high pressure Green light Positive high pressure Orange light Green light Use of the product Installation step Installation position Packaging accessories Installation step Use the remot...

Page 12: ...ding body and the bar body must be reliably connected to the grounding wire 6 The installation angle of the ion bar can be adjusted 100mm 100mm 60 200mm Charged object WALL WALL WALL WALL Metal conduc...

Page 13: ...idden to use this equipment in flammable and explosive environments 5 Unauthorized disassembly of the product is strictly prohibited internal maintenance and repair must be performed by professionals...

Page 14: ...of the power cable Power supply mismatch Check whether the power cable is in good condition and securely connected No power supply and the left port green power indicator is off Check the power supply...

Page 15: ...reates Value Speciality Creates Value Shanghai Anping Static Technology Co Ltd Tel 021 64517676 Fax 021 64517673 Postcode 200233 Website www ap static com Address 3 F Building 27 No 69 Guiqing Road Sh...

Reviews: