Check item 1: Check the main breaker safety and stability;
Check item 2: Check the battery voltage.
WARNING
If this checking process is executed for any reason after the battery is fully installed,
make sure that the inverter is turned off or break the connection between battery and
inverter while checking the battery.
CAUTION
There is a hook on the cover plate back, please following the indication which stuck
on the cover.
1.
Remove the top cover. Loosen the eight hex
socket screws at the cover, and pull it up.
2.
Make sure to set the SW7 select DIP switch
to 001
2
. See
part 5.2
.