![Anviz T5 User Manual Download Page 65](http://html.mh-extra.com/html/anviz/t5/t5_user-manual_2948691065.webp)
59
Add a shift:
Click [Append] and enter corresponding shit information in [Shift Name] such as:
normal shift [Cycle] (1), [Cycle Unit] (week), and click [Add], select the timetables
and time range required in this shift in the springing window (see the Pic5.3 below)
For instance, select the timetable – Day shift and select from Monday to Friday and
then click [OK], back to this window and click [Save] to complete. (Please refer to the
example for details.).
Pic5.3
Delete the timetable: Select the timetable you want to delete and click [Delete].
Summary of Contents for T5
Page 9: ...3 1 3 Size ...
Page 80: ...74 Print Report Toolbar of report preview is as the following picture ...
Page 92: ...86 7 Appendix 7 1 Wiring Instruction ...
Page 93: ...87 ...
Page 94: ...88 7 2 Wiring diagram Access Control Reader Power Supply ...
Page 95: ...89 Access Control Reader Switch Power Supply ...
Page 96: ...90 Access Control Reader Controller ...
Page 97: ...91 Communicate with PC ...