P/N 1011436 Rev. H 02/21
13
Checking the Conveyor Belt
Chains
Measuring conveyor belt Chains
1.
Turn the unit off, unplug the power
cord, and allow the unit to cool.
2.
Remove the Bun Feeder and Bun
Chute (Figure 2). Set the Bun
Thickness Compression Knobs to 6
& 6.
3.
Open both Conveyor Covers.
4.
Remove the Belt Wraps and set aside
(Figure 5).
5.
Facing the toaster, locate the
approximate center-point of the
Conveyor Belt Chain.
6.
Pull the chain away from the edge of
the toaster (Figure 10).
7.
Measure the distance from the frame
of the unit and the chain. A U.S.
Dime (1.8 cm) can be used for the
measurement (Figure 10).
8.
If the gap is 2 times wider than the
coin or larger than 3.6 cm, remove
one 1/2” link as described below.
9.
Disconnect the chain by squeezing
any two links together and unhook
the links from each other (Figure 11).
Needle-nose pliers may be used.
NOTE:
There are two small 1/2” links
on each side of the Conveyor
Belt Chain. The rest are large
3/4” links.
10.
Remove one 1/2” link from the chain.
11.
Reassemble the chain onto the
sprockets as described in the
Replacing Conveyor Belt Chains
section of this manual.
12.
Measure the gap again with the coin.
The coin should fit snuggly between
the chain and frame.
13.
Check the opposite side of the toaster
using the same steps.
14.
When finished, reassemble the unit
and return to operation.
NOTE:
If the ends of the Conveyor Belt
Chain cannot be connected,
remove an additional small 1/2”
link and install a large 3/4” link
in its place.
Replacing Conveyor Belt Chains
1.
Turn the power off, unplug the power
cord, and allow the unit to cool before
proceeding.
2.
Remove the Bun Chute and set the
Compression Control Knobs to 6 & 6.
3.
Open both Conveyor Covers.
4.
Remove both Belt Wraps and set
aside.
5.
Disconnect the Conveyor Belt Chain
by squeezing any two links together
and unhook both ends of one link
(Figure 11). Repeat on other side.
6.
Place the new chain on the top
sprockets with hook ends down.
NOTE:
The ends of the hooks must
point down (Figure 11).
7.
Wrap the chain around the top and
lower sprockets. Hook both ends
together. Repeat on other side.
NOTE:
Install the Conveyor Belt Chains
under the upper and lower
Support Rods.
8.
If the Belt Wraps are in good
condition, reinstall. Otherwise install
new Belt Wraps.
9.
Close the Conveyor Covers, set the
Bun Thickness Compression Knobs
back to their
normal settings and reinstall the Bun
Feeder and Bun Chute.
Figure 10. Measuring Conveyor Belt
Chain
Figure 11. Removing Conveyor Belt
Chain
Rotation
Upper Support Rod
Large Link
P/N 0800121
Small Link
P/N 0800204