
IP Network Measurement Division
9
40G Quick Start Guide
(
Jitter
)
Before Use or Before Setup
Before Use or Before Setup
IP Network Measurement Division
10
40G Quick Start Guide
(
Jitter
)
Measuring static electricity Prevention
Measuring static electricity Prevention
Before Operate
Before Operate
-
-
1
1
To prevent damage caused by static electricity, always put a conductive mat the working table.
In addition, the individual who is operating, should wear a wrist strap as shown below.
And plug connect it into the protective ground before connecting the coaxial cable to the equipments.
Conductive Mat
WRIST STRAP
Protective Ground
of equipment
Discharge the operator’s static electricity by connecting the cabinet to the operator by using a “
”.
5