
Post Calibration
Actions
After the calibration process is completed, perform the following ac-
tions, as appropriate:
If the calibration passes:
Save the calibration data to (hard) disk, as follows:
Step 1.
Press the
Option Menu
key (Enhancement key group) to dis-
play the OPTIONS menu.
Step 2.
Select DIAGNOSTICS from menu, then select in se-
quence: H/W CALIBRATIONS | DISK OPERATIONS |
SAVE TO HARD DISK | HW_CAL.LO2.
If the calibration fails:
Step 1.
Repeat the calibration.
Step 2.
If the calibration fails, replace the A2 PCB and perform the
calibration again.
LO2 CALIBRATION
ADJUSTMENTS
6-6
37XXXD MM
Summary of Contents for 37 D Series
Page 3: ......
Page 4: ......
Page 12: ......
Page 14: ...1 2 37XXXD MM Figure 1 1 Series 37XXXD Vector Network Analyzer System...
Page 26: ......
Page 36: ......
Page 38: ......
Page 62: ......
Page 80: ......
Page 82: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 148: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 184: ......
Page 190: ......