Post Calibration
Actions
After the calibration process is completed, perform the following ac-
tions, as appropriate:
If calibration passes:
Save the calibration data to (hard) disk, as follows:
Step 1.
Press the
Option Menu
key (Enhancement key group) to dis-
play the OPTIONS menu.
Step 2.
Select DIAGNOSTICS from the menu, then select in se-
quence: H/W CALIBRATIONS |DISK OPERATIONS
|SAVE TO HARD DISK|HW_CAL.ALC.
Perform the Port 1 Power test in Chapter 4, Operational Performance
Tests. If the test fails, proceed to Chapter 7, Troubleshooting.
If calibration fails:
q
Verify that the GPIB cable is connected to the
Dedicated GPIB
(bottom) connector on the VNA’s rear panel.
q
Verify that the power meter and sensor are functioning correctly,
the cables are in good condition, and all connections are secure.
q
Verify the correct power sensor data exists in the power meter.
q
Repeat the calibration. If it still fails, then proceed to Chapter 7,
Troubleshooting.
ADJUSTMENTS
RF POWER/ALC CALIBRATION
37XXXD MM
6-13
Summary of Contents for 37 D Series
Page 3: ......
Page 4: ......
Page 12: ......
Page 14: ...1 2 37XXXD MM Figure 1 1 Series 37XXXD Vector Network Analyzer System...
Page 26: ......
Page 36: ......
Page 38: ......
Page 62: ......
Page 80: ......
Page 82: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 148: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 184: ......
Page 190: ......