6
ENERGY BOX
:
1.Built-in battery specification to select 100AH-250AH/12V.
2. Battery shall be put in sequence according to the direction shown in the picture.
3. Maximum load bearing 300KG.
4. Each battery needs to be fixed with a scaffold.
5. Note that the battery connection terminal is not in contact with the battery box.
External battery method
1. Users can set up their own external batteries according to their own needs.
2. The external battery pack voltage shall be in line with the system requirement voltage
(
3.2KW/24V
5KW/48V
)
,
Battery capacity reference back-up time.
3. The external battery access location is the DC breaker input side. Note the positive and negative polarity
of the battery, and the battery pack cannot be short-circuited.
4. Please keep DC breaker in OFF state before accessing the battery pack.
Web: anern-marketing.com | Email: [email protected] | Whatsapp: +86 13058030989