GROUND POLE INSTALLATION (96cm System)

MIN.
DIA.

d

d

MIN.
DIA.

ANT

2.88" or

3.00" O.D.

2.88" or

3.00" O.D.

40"

C

L

72"

36.4"

36.4"

increased,

72"

41.5"

50" depth may be

will increase

length of rebar

concrete and

accordingly.

2"

2"

50"

NOTE:

#3 REBAR x DIA. OF PIER, INSERT

FROST LINE

#3 REBAR x

DIA. OF PIER

INSERT THRU HOLE

IN TUBE & CENTER

AT 90

o

APART

(SEE NOTE)

(4)#3x24"MIN.

BELOW

THRU HOLE IN TUBE & CENTER

1" to 2"

WATER RUN OFF

GRADE

SLOPE FOR

BELOW

FROST LINE

APPROX.

1" to 2"

SLOPE FOR

(SEE

NOTE)

GRADE

WATER RUN OFF

GROUND

ANT WIND VEL. DIM “d” CONC VOL.

DIM “d”

CONC VOL.

DIM “d’

CONC VOL.

DIM “d”

CONC VOL.

 POLE 

80 MPH

7”

0.9 

10”

1.8 

7”

1.2

7”

1.2

“A”

90 MPH

8”

1.2 

13”

3.0 

7”

1.2

8”

1.5

96cm

100 MPH

10”

1.8 15”

4.0  7”

1.2

10”

2.4

“A” or

110 MPH

11”

2.2 

17”

5.2 

7”

1.2

11”

2.9

“B”

125 MPH

14”

3.5 

20”

7.2 9”

1.9

14”

4.7

“B” Only

POLE SPECIFICATIONS:

Ground Pole “A” = 3.00 O.D. x 10 G.A. x 72” Steel

Ground Pole “B” = 2

⁷⁄₈

O.D. x .203 Wall x 72” Steel ASTM 120 Mech Tubing (2

¹⁄₂

Sch. 40)

NOTE:

Pole not supplied and must be field drilled 

⁵⁄₈

” dia. for #3 rebar and drilled .218 for 

¹⁄₄

-20 self tapping grounding

screw (see Page 7) and galvanized  or painted for protection.

1 - Pole and foundation design based on the following criteria:

a) Uniform building code exposure B or C and 1.5 stability factor.
b) Vertical soil pressure of 2000 pounds per square foot.
c) Lateral soil pressure of 400 pounds per square foot.
d) Concrete compressive strength of 2500 pounds per square inch in 28 days.

2 - 

CAUTION

- The foundation design shown does not represent an appropriate design for any specific locality since soil conditions vary

and may not meet design criteria given in Note 1. You should consult a local professional engineer to determine your soil conditions
and appropriate foundation.

Exposure “B”

Exposure “C”

Exposure “B”

Exposure “C”

PIER FOUNDATIONS

DEEP FROST LINE FOUNDATIONS

Bubble
Level

Ground Pole
Must Be
Vertical In
All Directions
Within .19 Inches
At Top (0.3ß)

STANDARD 
PIER FOUNDATION

DEEP FROST 
LINE FOUNDATION

3

AZ-EL MOUNT WITH M8 INSERT AND SET SCREW

IMPORTANT

M8 x 20 mm Hex Head Set Screws are recommended for schedule 40 (.203 wall) mast and
NOT RECOMMENDED for mast with a wall thickness less than 10 ga (.134) such as 
Non-Penetrating Roof Mounts and Roof/Wall Mounts

.

Once fine tuning is complete and all Clamp Bolts are equally torqued to 18 ft-lbs. in 
accordance with 8000842 manual, then install the two M8 x 20 mm Hex Head Set Screws
supplied. Install one in each clamp half as shown in Fig. 1.0. Torque each M8 x 20 mm
Hex Head Screw to 15 ft-lbs. Repeat torque to insure 15 ft-lbs. has been reached on both
screws.

See Manual 8000842 for additional instructions not shown here.

Clamp Bolts

M8 x 20 mm
Hex Head
Set Screw

M8 Insert

Half Clamp

14

Figure 1.0 

(AZ-EL Mount with M8 Insert and Set Screw)

Summary of Contents for 123 Class I

Page 1: ...SA Customer Support Center From North America Telephone 1 800 255 1479 Fax 1 800 349 5444 satcom andrew com One Company A World of Solutions International Telephone 1 708 873 2307 Fax 1 708 349 5444 I...

Page 2: ...iately upon failure Non compliance with any part of this claim procedure may invalidate this warranty in whole or in part THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER AGREEMENTS AND WARRANTIES ANY...

Page 3: ...required before installing an antenna It is the property owner s responsibility to obtain any and all permits Before any digging is done information regarding the possi bility of underground telephone...

Page 4: ...foot c Lateral soil pressure of 400 pounds per square foot d Concrete compressive strength of 2500 pounds per square inch in 28 days 2 CAUTION The foundation design shown does not represent an approp...

Page 5: ...protection 1 Pole and foundation design based on the following criteria a Uniform building code exposure B or C and 1 5 stability factor b Vertical soil pressure of 2000 pounds per square foot c Late...

Page 6: ...lector and insert exposed portion of bolt to holes in Antenna Bracket Flange Install 4 Lock Washers and Hex Nuts on bolts Ref Fig 1 2 Assemble Extension Plate to AZ EL Housing using two M6 x 22mm Roun...

Page 7: ...nd Hex Nuts Round Head Square Bolt fits on the underside of Mount Housing top flatten end of Brace on top side of Mount Housing Tooth Lock Washer on top of flatten end of Brace then Flat Washer and He...

Page 8: ...or and Support Block to 4 ft lbs 5 4 N m Tighten and torque M6 x 55mm U Bolt to 18 22 in lbs 2 2 5 N m TOOTH WASHER BLOCK U CLIP BRACE SIDE FEED LEGS 2 REQ RD HD SQ NK BOLT ELASTIC LOCK NUT BOTTOM FEE...

Page 9: ...ion and counterclockwise to increase elevation Align the edge of the Clamp with appropriate mark on housing at the desired elevation reading This will be an approximate setting Optimum setting achieve...

Reviews: