
User Manual
16
If found the pump water during operation, the user must stop immediately, and lifting
the LFP80-50 model pump tank. When the pump and pump tank completely heat,
firstly clean pump tank water, and then flat pump, the pump purge for about 10 hours
by hot air, blow out the evaporation of water in the pump body. In the blowing
process, the pump needs to be heated to 40
℃
, and change the direction of pump
and hot air entrance, every 2 or 3 hours.
◆
APPENDIX
Ⅰ
: INSTRUCTIONS FOR USE
ACCESSORIES
1.
Accessories list
No.
Name
Material
Specification
Amount
1
Copper tube
T2
φ8×φ6×15mm
9
2
Shrinkable tube
Polyolefin
Hφ10/5
1000mm
3
Steel wire
304
φ1
800mm
2.
The Location Copper tube used
Copper wire joint.
Method of use:
After copper wire into tube, use fast hydraulic pliers to press those tight.
Refer to the picture 1 below.
3. The Location Shrinkable tube used
Set out in the pressed copper wire exposed.
Method of use: Set a certain length of shrinkable tube out in the pressed copper wire where is
exposed. Use heat blower to heat the shrinkable tube until it shrink uniformity. Once again set
shrinkable tube out in the tube which has been shrinking, and use heat blower to heat the
shrinkable tube until it shrink.
NOTICE!
No damage in the shrinkable tube.
4. The method of use for Steel wire