2) Through the joint assembly, In thread wrapped with raw material, Using a wrench
through the six party at the threaded hole connection box assembly screw pump tank
cover on the inner(reference to figure 1). While installing the Junction box, as far as
possible to avoid the mutual rotation between parts, because there is direct current ,
If the relative rotation is too heavy, the 3 wires in the motor of tank pump may be
even snare because twine each other.
3) Hang the cover of pump tank up, and put the LEP50-32 model pump upright with
outlet flange upwards. Move pump below the cover of pump tank, Adjust position
between the pump tank cover and the pump outlet flange, make the pump outlet
flange and the 4 threaded holes on pump tank cover are aligned with each other. Put
the spring energy storage ring, fastening pump to the cover of pump tank through
bolts and nuts using a wrench.
4) 3 wire of motor corresponding to 3 line into the connection box wire nasal, wire
clamp fastening.
5) Use thermal heating gun to bake heat shrink tube external the nose line, heat shrink
tube will become soft shrinkage at 105
℃
. Note the uniform heating, heating layer
thick heat shrink tube.
6) LFP80-50 model pump with pump tank cover lifting to the pump tank, and properly
install the pump tank cover, at once finish the installation of the pump body.
7) LFP80-50 model pump must be supplied power through the inverter, are not allowed
to avoid the frequency converter pump at any time. Operation frequency is arranged
according to the pump nameplate on the speed.
Spanner
Heat shrink
Scissor
s
Inner hexagon
spanner
Heat gun
Wire stripper