ANDELI
安德利
TIG-250GPLC
14
安装调式及操作
Installation, debugging and operation
注意:请严格按照以下步骤进行安装与调式!
Notes: Please carry out installation and debugging in strict accordance with
following steps!
电器连接必须在关闭配电箱电源开关后进行!
Electric connection must be carried out after turning off power switch of
distribution box!
本设备防护等级为
IP21
,应避免在雨中使用!
Protection grade of the equipment is IP21, and it is necessary to avoid using
in the rain!
安装方法
Installation method:
1
:每台机器都装有
4
平方一次电源线,应根据焊机的输入电流及电压将一次线接在相应电压
等级大于
34A
的短路器上或连接大于
4
平方的电线上。切勿接错电压等级。
1:
Each machine is equipped with 4mm
2
primary power line, it is necessary to connect
primary line with circuit breaker which corresponding voltage class is greater than 34A or
electric wire which is greater than 4mm
2
in accordance with input current and voltage of
welding machine. Be sure not to connect with wrong voltage class.
2
:一次电源要与对应的电源接线柱或插座接触良好,防止氧化。
2:
Contact between primary power supply and corresponding power line binding post or
socket shall be good and prevent oxidization.
3
:用万用表测量一下输入电压是否在焊机的额定输入电压范围之内。
3:
Use multimeter to measure whether input voltage is within the scope of rated input voltage
of welding machine.
4
:如果焊机放在倾斜面上应固定好焊机防止其下滑。
4: If welding machine is placed on inclined plane, it is necessary to fixate welding machine
and prevent gliding.
5
:每台焊机都装有绝缘手柄,移动焊机时用手提升。
5:
Each welding machine is equipped with insulated handle, and use hand to lift when moving
the welding machine.