C O N T E N S
How to Install the Pump
Fasten 6 screws to mount the bill-board bracket on the monitor.
Connect all connectors.
Fasten all screws.
Use brackets and fasten all screws to joint the left and right floor controllers.
External view of the Pump
Connect the connector cables between the floor controller and main ass’y.
Mechanical Drawing
Outward Shape of PUMP IT UP
18
19
How to Install the Pump
1
Fasten 6 screws to mount the bill-board bracket on the monitor.
6 - M 6 X L 2 0
Bill Board Bracket
Main Case