Anchor products are of superior design and operate best within the parameters of these instructions.  It is imperative 
that the instructions be carefully read and 

COMPLETELY

 

FOLLOWED

.  Please read installation instructions before the 

installation or removal of this product.  Installation instructions are available online at 

www.anchorinc.com 

or by calling 

1-800-544-4445.

CAUTION: 

1.  For each installation, the installer is solely responsible for evaluating the site and the proper securing method 

determined.  Some soils require different staking or securing than that provided with the tent.  Due to this variety of 
soil conditions, these are the manufacturer’s suggested sequence of installation procedures.  Anchor’s responsibility 
is limited to the manufacture of the tent parts and materials.  We are not responsible for methods that installers may 
choose to erect and secure the tent to the ground.  

2.  The number of stakes suggested in the installation instructions do not necessarily meet all or any relevant codes 

on the site of the tent installation.  The number of stakes suggested 

will, in many cases, keep the tent erected,

 

however, due to various soil conditions; these stakes will be insuf

¿

 cient 

to keep the tent secure in high winds

.  

It is the tent installer’s responsibility, not the manufacturer, to determine the appropriate number of stakes to meet 
the necessary wind loads on the site.  Regardless of the number of stakes we suggest, we make no representation 
or warranty as to whether this speci

¿

 c number of stakes will meet the local tent code.  Anchor does not, nor can 

it make any suggestions, representation, or warranties about the adequate staking required at each speci

¿

 c 

installation site.  Staking information provided in the installation instructions 

is not a suggestion about what is 

necessary to meet a site-speci

¿

 c load.

  

For additional important information, consult:  “The IFAI Procedural Handbook For the Safe Installation and 
Maintenance of Tentage” and the IFAI Pocket Guide “Pullout Capacity of Tent Stakes”, both available from 
the IFAI Tent Rental Division or on our website.

3.  Inasmuch as the weather is unpredictable, good judgment and common sense must be incorporated within 

installation guidelines.

  

It is the responsibility of the tent installer/maintainer to determine the severity of the weather, 

proper time and method of installation and/or erection and disassembly.  

Note:  We recommend that snow and 

ice be removed from the tent surface as soon as possible because accumulation will damage the tent 
or fabric structure.  Please consult with our Engineering Department about the maximum loads for each 
product.  

This product has been manufactured for use as a temporary sunshade structure.  For the safety of all occupants, 
evacuation is recommended if threatening weather occurs, or if there is any doubt concerning the safe use of this 
product.

4.  Proper safety equipment should be used at all times to insure a safe installation and take down.  We suggest a 

careful evaluation be made to determine safety equipment needed, such as hard hats, steel-toe shoes, safety 
glasses and other as required.  It is our desire that all installations are safe.  Please be aware of hidden dangers 
both underground, i.e., gas lines, water lines, electrical lines, etc. and above the tent such as power lines and 
telephone lines.  

5.  Anchor stands behind its products in accordance with its standard Terms and Conditions of sale.  A copy of our 

Terms and Conditions of Sale can be obtained by contacting Anchor at the telephone number and/or address on 
this document.

EVANSVILLE, INDIANA

PHONE NUMBER

812· 867· 2421

FAX NUMBER

812· 867· 0547

28.1  03-04-09

Summary of Contents for Perfectshade

Page 1: ...ns PS 1014 PRODUCTION FACILITIES EVANSVILLE IN PHONE 800 322 8368 or 812 867 2421 FAX 812 867 4636 EMAIL custdiv anchorinc com www anchorinc com SALES OFFICES 7701 HIGHWAY 41 N EVANSVILLE IN 47725 USA EC 4829 Perfectshade ...

Page 2: ...bundle of fabric 4 When moving frame sections by hand use proper lifting techniques to protect the back and avoid pinching fingers while making hardware connections 5 Do not drag bundle of fabric on concrete asphalt or ground as this can cause damage to the fabric from abra sion through the bag 6 The installation method described here requires coordination of tasks between workers A safe installat...

Page 3: ...tes un less noted otherwise NOTE The installer is solely responsible for determining the proper anchoring device DIMENSION CHART FOR BASE PLATE LAYOUT Size A B C D E 10 x 10 9 10 9 10 10 8 1 2 10 8 1 2 13 10 7 8 10 x 15 14 10 9 10 15 8 1 2 10 8 1 2 17 9 9 16 10 x 20 19 10 9 10 20 8 1 2 10 8 1 2 22 1 5 8 15 x 15 14 10 14 10 15 8 1 2 15 8 1 2 20 11 3 4 20 x 20 19 10 19 10 20 8 1 2 20 8 1 2 28 0 9 16...

Page 4: ...gure 4 Remove template before base plate installation Corner BB 1st Base Plate Template Corner AA 2nd Base Plate Template taped to concrete surface Ridge Figure 2 Corner CC Base Plate Template Corner DD Base Plate Template Upright Slide hip down over upright align ing holes Figure 3 Note that hole thru top of upright is perpendicular to hip and aligns with hole in hip Upright Hip Peak Weldments No...

Page 5: ...he base plate to the anchors but with only a loose fit at this time for aid in installation Step 8 Lift the peak end of the second hip up and place on the peak weldment Do not insert the bolt until later See Figure 7 Step 9 It may be necessary to lean or tip the upright to align it so that the hip can be slipped over the top of the upright Once the hip is on the upright check to be sure that the h...

Page 6: ...irst cor ner Using short bursts pull the fabric down over the corner using the web handles and attach as in Step 15 See Figure 11 Step 17 Proceed to the corner opposite the wire rope attachment corner Using the same technique as on Step 16 attach this corner Step 18 Proceed to the last corner The wire rope attachment corner See Figure 12 Slide a pull rope from the instal lation kit sold separately...

Page 7: ...tic bag or in the installation kit sold separately Using a pair of vice grips if available clamp or hold the two cables together on one side Examine each side to see which side is most acces sible Figure 15 Fasten one of the cable clamps onto the cables and tighten Fas ten a second cable clamp right beside the first one and tighten Figure 16 Step 22 Now loosen the tension on each of the come a lon...

Page 8: ... gravel to bottom of holes Bottom of pole must be allowed to drain water Frame may be assembled with uprights in holes See steps 5 through 12 for frame assembly When frame is assembled plumb and level frame and brace into position Fill concrete to ground level Allow concrete to dry 72 hours before installing fabric See steps 13 through 22 Note Concrete and gravel for setting uprights for embedded ...

Page 9: ...n provided in the installation instructions is not a suggestion about what is necessary to meet a site speci c load For additional important information consult The IFAI Procedural Handbook For the Safe Installation and Maintenance of Tentage and the IFAI Pocket Guide Pullout Capacity of Tent Stakes both available from the IFAI Tent Rental Division or on our website 3 Inasmuch as the weather is un...

Reviews: