2
Table of Contents
Page No.
Assembly Step
3
Introduction
Inspect
Site
Frame
Terminology
4
Component Illustrations
5
30’ Navi-Trac Component List Table
6
30’ Navi-Trac Component List Table Cont’d
7
Safety Guidelines
8
Squaring the Tent - Footprint Layout
9
Web Guy - Staking Guidelines
Assembling
the
first
Beam
10
Layout of all Beams
11
Erecting second Beam first
12
Connecting the First Two Beams
13
Installing Purlins
Completing
First
Bay
Completing
the
Top
Frame
Installing
the
Gabled
End
Frame
14
Installing Guy Webs
X-Cabled
Bays
15
Installing
Mid
Panels
Installing
Gabled
End
Panels
16
Safe Attachment of Pull Ropes to Fabric
Fabric
Tensioning
17
Completed Gabled End Unit Illustration
Alternate Hip End/ Gabled End Configuration
18
Combining Hip and Gabled End Assembly Steps
Component Changes for Hip/ Gabled End Configuration
19
Diagonal Beam Brace
20
Wall
Installation
21
Ground
Bar
Keeper
22
Limits
of
Liability