XFR Apprentice Workout Station
Assembly Instructions
What’s in the box?
(1) Metal Bar (split into two sections)
(1) Large Rubber O-ring for metal bar
(3) 31” Support Boards
(4) Anchor Straps
(8) Wooden Dowels
(8) Small Rubber O-rings
(8) Rubber Caps for Dowels
(3) 1/2 x 3 5/8 Lag Bolts
(3) 1/2 Lock Washers
(3) 3/8 Washers
(3) Vinyl Caps for Lag Bolts
(6) 5/8 X 4 Lag Screws
(6) 7/8 Washers