Connection
Configuration Mode
1. Connect the charger to the batteries as indicated
under
Installation.
2. Check the POL LED on the front panel. If it is glow-
ing red, the battery is connected in reverse polarity.
Correct the connection to the battery (The red terminal
should go to Positive and black to Negative).
3. Once the POL LED is off, connect the charger to the
Input power source. The I/P LED should start glow-
ing green. This indicates that the charger is receiving
power from the DC source and that its internal power
supply is working.
1. Press and hold the Program (PRG) button for three seconds until you hear a beep and the
DEV LED starts blinking. This indicates that the unit is in Configuration mode.
2. Press the Program (PRG) button to cycle through the parameters you can program. The pa-
rameter which you programming can be determined by which bottom row LED is blinking.
If the DEV LED is
blinking, you are
programming
the Battery Type
parameters.
If the FLT LED is
blinking, you are
programming the
Default Battery
Temperature
parameters.
If the BAT LED is blinking, you are
programming the Current Limit
parameters.
3. Press the Select (SEL) button to cycle through the settings for each parameter. The setting
can be determined by the combination of top row LEDs glowing.
After turning the charger on, it will immediately begin charging any connected batteries with
its pre-programmed parameters. These parameters can be accessed and changed through
Configuration mode.
TO ACCESS CONFIGURATION MODE:
CONNECTION INDICATORS
I/P
POL
TEMP
25
DEV
CH
75
SVC
FLT
LO V
BAT
50
EQ
PS
INPUT POWER
PRESENT
BATTERY POLARITY REVERSED
I/P
POL
TEMP
25
DEV
CH
75
SVC
FLT
LO V
BAT
50
EQ
PS