Figure 11. ADXRS800 Evaluation Software Installation Welcome 

From this point, complete the following steps to install the 
evaluation software: 
1.

 

Select the destination directory. The installer autopopulates 
the names of the directories in which to store the software 
GUI and required National Instruments products (see 
Figure 12). You can change these directories; however, 
most installations can proceed with the default values.  

2.

 

When you finish selecting a directory, click 

Next

. The 

National Instruments Software License Agreement is 
displayed. 

3.

 

Read the license agreement before accepting it; then, click 

Next

. The installer lists the required components to install 

on your PC (see Figure 13). 

4.

 

To start the installation, click 

Next

. The installer completes 

installation of the software evaluation GUI and all required 
National Instruments drivers and run-time engines. After 
the installation is complete, the box shown in Figure 14 is 
displayed.  

5.

 

Click 

Finish

 to complete the installation. 

09113-

012

 

Figure 12. Destination Directory Selection 

09113-

113

 

Figure 13. Start Installation (Listing Varies Based on PC Requirements) 

09113-

014

 

Figure 14. Installation Complete 

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Summary of Contents for ADXRS800

Page 1: ...onmental chamber for temperature or humidity testing Separating the boards mitigates corruption of data due to the temperature and humidity effects of other components The ISEB is a universal main boa...

Page 2: ...ng the Latest ISEB Firmware 4 Hardware Configuration 7 Inertial Sensor Evaluation System Graphical User Interface 8 Getting Started 8 View and Record Data Panel 9 Temperature Test Panel 10 Noise and R...

Page 3: ...need to select the drivers manually as follows 1 Connect the USB A to Mini B cable to the PC and then to the ISEB The satellite board does not need to be connected for this step New hardware is detec...

Page 4: ...ed COM port of the ISEB hardware The Device Manager window should look like the window shown in Figure 6 09113 007 Figure 7 System Properties INSTALLING THE LATEST ISEB FIRMWARE The latest ISEB firmwa...

Page 5: ...nd release SW2 c Release SW1 The download begins and is automatically verified by the downloader 2 If the downloading process fails which is indicated in the Monitor Status box see Figure 8 attempt th...

Page 6: ...ent is displayed 3 Read the license agreement before accepting it then click Next The installer lists the required components to install on your PC see Figure 13 4 To start the installation click Next...

Page 7: ...alternate high voltage supplies see the ADXRS800 data sheet and the Alternate External High Voltage Supply section of this guide ANALOG DEVICES ADXRS800 SATELLITE DEFAULT JUMPER POSITIONS CONNECTOR 0...

Page 8: ...o the Analog Devices inertial sensor evaluation system Select this COM port from the drop down menu and click Confirm COM to begin using the GUI After the COM port is confirmed the full functionality...

Page 9: ...indefinitely Secondary information that is transmitted along with the plotted signals is graphically represented This includes the fault register sequence bits status bits and sensor module bits This...

Page 10: ...llow for an indefinite length for data recording Before recording the data on this panel you can adjust for null offset components Note that any offset correction made to the ADXRS800 is stored in the...

Page 11: ...e free environment Any rotational rate input into the gyroscope can greatly degrade the validity of the resulting RAV plot Determining the rms noise of the ADXRS800 can be done on this same panel The...

Page 12: ...Stability button You are then prompted to enter a file name for the data upon completion of the specified number of turn on cycles or upon clicking the Stop Data Record button While the test is runni...

Page 13: ...avior of the ADXRS800 for incorporation into your system s algorithms For this test panel the first SPI message is typically received from the device within 20 ms after the ISEB supplies power to the...

Page 14: ...llite board through 180 90 can also be used Because the satellite board is approximately square as each adjacent side is brought flush with the straight edge 90 of rotation will have been experienced...

Page 15: ...bed in detail in the ADXRS800 data sheet The main requirement for the external high voltage supply is that 0 1 mA to 1mA of current be supplied to the device The nominal internal voltage is 22 5 V As...

Page 16: ...of this Agreement Customer agrees to promptly return the Evaluation Board to ADI ADDITIONAL RESTRICTIONS Customer may not disassemble decompile or reverse engineer chips on the Evaluation Board Custo...

Reviews: