
©AM SENSORS LTD
6
7
AMS-S-082/DS/09.2016 (ISSUE 2)
Installation
5. Electrical Connections
WARNING:
It is essential that the electrical supply to the switch does not exceed the
electrical rating of the reed switch and that loads in excess of the maximum
reed switch operation are not applied.
Ensure the switch is not operated outside its designated temperature range
(see label).
5.1 Installing the Cable Gland
If ordered with the switch, install the cable gland flange FS4825 to the ATEX
Group I float switch using the M8 x 35mm Bolts, Nuts and washer (supplied
with the flange), ensuring that a suitable gasket is installed between the flange
faces (not supplied) as shown below.
The cable gland flange FS4825 is designed to take a M25 x 1.5 ATEX rated
cable gland, install the cable gland onto the cable gland flange FS4825,
ensuring that the manufactures instructions are strictly followed.
Vessel Mounting
Arrangement as
shown in Fig 1
Item 3 –
Float Arm Assy
Item 2 –
Gasket (Supplied)
Item 1 –
Float Switch
Body
Orientation
Hole
FS4825 M25
Cable Gland
Flange
(Optional)
Gasket
Float Switch Assembled View
Installed on to the Vessel
Fig 2: