background image

AMP

®

 Deck Lights (Integrated)

ADL Series

INSTALLATION & MAINTENANCE GUIDE

–4–

w w w. a m p l i g h t i n g . c o m

–4–

Remove Cover

Install Cover

1

3

Rotate the cover clockwise until it 

stops, then lift the cover straight off. 

Note: The first time may be difficult 

because the luminaire has a very 

tight o-ring seal and a grease sealant 

for moisture protection.

Align the notches on the cover to the 

base. Firmly rotate the cover until it 

locks.

Luminaire

Cover

Cover

Base

Base

Install Base

2

Attach the base on the wall making 

sure the arrow is pointing in the 

correct direction and secure with the 

lock screws. 

Note: Wall anchors are required for 

certain installation conditions (e.g.  

Brick wall, Concrete Wall, etc). Mark 

holes on the wall from the base for 

the wall anchors. Remove the base 

and drill proper holes on the wall, 

then insert the wall anchors.

Base

Lock 

Screw

Wall Anchor

Reviews: