Diagram 2

NOTE: 

The PSF 16 Channel Power Supply and Filter Pack must be orientated so the 

AC power Connections are in the equipment room

.  The 

product will be labeled SCAN ROOM SIDE. 

Diagram 1

 - Mounting

Installation:

Shielding Facing 

Equipment Room

Shielding Facing 

MRI Room

Step 1: 

Cut a rough opening in the intended mounting surface measuring 

11.25” x 8”. This Step should be performed by a trained RF Vendor/

Installer.

Step 2: 

Note whether the Shielding Material of the wall is facing the 

Equipment Room or the MRI Room. This will determine how to 

secure the PSF 16 Channel Power Supply and Filter Pack in place. 

The flange must be mounted against the shielding material with 

the supplied gasket in between. Reference 

Diagram 1. 

Step 3: 

Place the provided gasket along the inner edge of the flange so it 

is held in place between the flange and the shielding surface. 

See 

Diagram 2

. Be sure the shielding and power supply plate are clean 

before applying the RF Gasket.

Step 4: 

Secure the PSF 16 Channel Power Supply and Filter Pack and gasket in place with the supplied screws using the 20 screw holes located 

around the perimeter of the flange.  

Step 5:

Reference the project specific plans for complete wiring instruction to make the appropriate 

Electrical Connections. 

Reference 

Diagram 4

 

for instruction on how to open the AC wiring compartment. 

Note:

 Knockouts are provided.  Use an appropriately sized connector clamp to secure the wiring entering and leaving the Filter Pack.  

Additional knockouts may be added if necessary.

Note:

 A divider will be provided from the factory to separate Class 1 and Class 2 wiring. If using Class 1 wiring, the divider can be removed as 

shown in 

Diagram 3.

RF GASKET

RF GASKET

RF GASKET

RF GASKET

CLASS 1

WIRING

CLASS 2

WIRING

DIVIDER

Diagram 3

Diagram 4

Summary of Contents for PSF16

Page 1: ...t 3 Warning This equipment must be installed operated and serviced only by trained qualified individuals Avertissement Cet quipement doit tre install utilis et r par uniquement par des personnes form...

Page 2: ...ange so it is held in place between the flange and the shielding surface See Diagram 2 Be sure the shielding and power supply plate are clean before applying the RF Gasket Step 4 Secure the PSF 16 Cha...

Page 3: ...Lights LP6 4 Down Lights LP6 4 Down Lights LP6 Diagram 5 8 Directionals LPD 4 Down Lights LP6 4 Down Lights LP6 4 Down Lights LP6 Diagram 5 4 2 x2 Ceiling Image IDP 4 Down Lights LP6 4 Down Lights LP6...

Page 4: ...n Equipment Room Near Penetra on Panel OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN PSF16 Located In Scan Room Near Penetra on Panel Located...

Page 5: ...r Technologist Desk Equipment Room Side Scan Room Side BROWN LIGHT BLUE GREEN 110 240 VAC Customer Supplied RED ZONE 1 GRAY DIM GREEN YELLOW ORANGE DIM RED DIM ZONE 2 ZONE 3 ZONE 4 DIM BLACK GRAY VIOL...

Page 6: ...ted In Equipment Room Near Penetra on Panel Located Near Technologist Desk Equipment Room Side Scan Room Side BROWN LIGHT BLUE GREEN 110 240 VAC Customer Supplied RED ZONE 1 GRAY DIM GREEN YELLOW ORAN...

Page 7: ...Equipment Room Near Penetra on Panel Located Near Technologist Desk Equipment Room Side Scan Room Side BROWN LIGHT BLUE GREEN 110 240 VAC Customer Supplied ZONE 1 GRAY DIM GREEN YELLOW ORANGE DIM DIM...

Page 8: ...ent Room Near Penetra on Panel Located Near Technologist Desk Equipment Room Side Scan Room Side RED ZONE 1 DIM ZONE 2 ZONE 3 ZONE 4 DIM DIM DIM ZONE 1 BLACK GRAY VIOLET RED WHITE DIM DIM BROWN LIGHT...

Page 9: ...9 Wiring Diagram 6...

Page 10: ...10 Wiring Diagram 7...

Page 11: ...human health and the environment For more information on available collection facilities contact your local waste collection service or the place of purchase Amico Lights Corporation 122 B East Beaver...

Reviews: