User Responsibility
Preparation Before Installation
The installation instructions provided are for the Amico standard products. Slight modifications to the installations may
be required. The product shipped to the job site may not be exactly as shown on the installation drawings. See additional
sheets for project specifics where required.
IMPORTANT: PLEASE READ CAREFULLY PRIOR TO START
• Review and understand all instructions before commencing work.
• Headwall installation should conform to the local building codes.
All on-site preparations must be done prior to the delivery of the Headwall. Please contact Amico to confirm and review
all information listed below. Failing to do so may result in discrepancies/misalignments during installation.
Please Note These Keywords and Symbols:
WARNING:
Steps where extra care should be taken to prevent injuries and damage.
NOTE:
Steps that point out helpful information.
IMPORTANT:
Be sure to observe this instruction.
1. Review a copy of the final approved shop drawing(s) and/or submittal package. These documents will provide you
with technical information specific to your installation, such as:
• Equipment types and quantities
• Room numbers and locations
• Shop drawings of each unit type
• Wiring diagrams and rough-in locations
• Blocking locations
IMPORTANT:
Before the installation of drywall, make sure the blocking required for mounting the headwall is
installed at locations indicated on shop drawings.
WARNING:
All wiring must be completed per the National Electrical Code and/or local electrical codes by a
licensed electrician.
2. Prepare the tools and hardware needed to complete the installation. Some common tools that may be required are:
• Cordless drill/driver with common drill or drive bits
• Hand tools (screwdrivers, wrenches, clamps, pliers, etc.)
• Laser- or Bubble-level
• Ladder(s)
• Jigsaw or reciprocating saw