User Responsibility

Preparation Before Installation

The installation instructions provided are for the Amico standard products. Slight modifications to the installations may 

be required. The product shipped to the job site may not be exactly as shown on the installation drawings. See additional 

sheets for project specifics where required.

IMPORTANT: PLEASE READ CAREFULLY PRIOR TO START 

•  Review and understand all instructions before commencing work.
•  Headwall installation should conform to the local building codes.

All on-site preparations must be done prior to the delivery of the Headwall. Please contact Amico to confirm and review 

all information listed below. Failing to do so may result in discrepancies/misalignments during installation.

Please Note These Keywords and Symbols:

 

 WARNING: 

Steps where extra care should be taken to prevent injuries and damage.

 

 NOTE: 

Steps that point out helpful information.

 

 IMPORTANT: 

Be sure to observe this instruction.

1.  Review a copy of the final approved shop drawing(s) and/or submittal package. These documents will provide you 

with technical information specific to your installation, such as:

•  Equipment types and quantities
•  Room numbers and locations
•  Shop drawings of each unit type
•  Wiring diagrams and rough-in locations
•  Blocking locations

 IMPORTANT: 

Before the installation of drywall, make sure the blocking required for mounting the headwall is 

installed at locations indicated on shop drawings. 

 WARNING: 

All wiring must be completed per the National Electrical Code and/or local electrical codes by a 

licensed electrician. 

2.  Prepare the tools and hardware needed to complete the installation.  Some common tools that may be required are: 

•  Cordless drill/driver with common drill or drive bits
•  Hand tools (screwdrivers, wrenches, clamps, pliers, etc.)
•  Laser- or Bubble-level
•  Ladder(s)
•  Jigsaw or reciprocating saw

Summary of Contents for NuLook FlexWall

Page 1: ...Installation lnstructions NuLook FlexWall...

Page 2: ...are should be taken to prevent injuries and damage NOTE Steps that point out helpful information IMPORTANT Be sure to observe this instruction 1 Review a copy of the final approved shop drawing s and...

Page 3: ...e 1 Hardware 2 8 Self Drilling Flat Head Screw Yellow Zinc Plated Part H SDF QX 08125 1 1 4 X 8 X 8 X 8 X 6 0 164 Head Cap Screws 1 4 x 3 4 Part C H HDCAP 0207 1 4 BS Plate Washer Part C H WFS 02 1 4...

Page 4: ...fore fastening The Amico Engine NOTE Please refer to the dimensions indicated on shop drawings 2 Insert Engine into tracks using lift and drop method Figure 1 Installation Figure 1 Engine Installation...

Page 5: ...TE Medical gas pipes and electrical are terminated as per shop drawing WARNING Only for Back to back units with 3 5 8 studs braze the gas pipes with caution to prevent any damage to the acoustic sheet...

Page 6: ...ANT See Page 10 for panel removal and handling instructions Step 2 Drywall Installation Provided by Others IMPORTANT Before installing drywall make sure the blocking is provided on the exact location...

Page 7: ...middle unit 5 Align the sections and connect in 4 places along the vertical edges of each section Figure 5 using the hardware provided as shown in Hardware 1 IMPORTANT Make sure the frames are flush a...

Page 8: ...4 screws 7 Connect the medical gases to the FlexWall Engine NOTE The ends of Hose Assemblies have gas specific adapters meant to plug into the FlexWall Engine WARNING Orient and secure gas hoses so th...

Page 9: ...its to the termination box and install cover plates over the box 10 Attach all removed items Panels must clip in properly where applicable Devices and cover plates Reinstall the rails if applicable IM...

Page 10: ...s where applicable Remove Top Plate Remove Insert Strip Remove Screws 2 Remove device cover plates and gases 3 Remove panels using the provided suction cup WARNING Stack panels face to face to prevent...

Page 11: ...ERM BOX minimum unit height 90 1 2 3 4 6 8 9 11 5 7 10 Horizontal opening required to install stud frame is 52 1 8 2 51 mm Termination Box from Top of Stud TYP 81 5 8 2 073 mm Maximum Ceiling Height 1...

Page 12: ...oration 85 Fulton Way Richmond Hill ON L4B 2N4 Canada 600 Prime Place Hauppauge NY 11788 USA Toll Free Tel 1 877 462 6426 Tel 905 764 0800 Fax 905 764 0862 Email info amico com www amico com ACA IM NU...

Reviews: