www.amico.com
7
Installation
4. Lift the right unit and hang it over the brackets which are already installed on the wall, then the left unit, prior to
installing the middle unit.
5. Align the sections and connect in 4 places along the vertical edges of each section (
Figure 5
), using the hardware
provided as shown in (
Hardware 1
).
IMPORTANT:
Make sure the frames are flush along the top and front. (
Figure 7
).
Figure 5
Bolt & Nut
Connections
Top View Detail/Cross Section
0.750"
Figure 6
Flush
Hanging Brackets
Bolt the frames together
Figure 7