Technical Specifications
a. Project Information
Project Name
Omega Filter Model
Omega 13.5K
Omega 18K
Filter Catalog Number
Quantity
Manufacturer Serial Number
Service
Tag Number
Production Date
b. General
Max. Operating flow rate
550 m
3
/hr (2,400 gpm)
750 m
3
/hr (3,300 gpm)
Operating pressure Min. / Max.
2.0 bar (30 psi) / 10.0 bar (150 psi)
Design Pressure
10.0 bar (150 psi)
Design Temperature
60
0
C (140
0
F)
Design Code
Filtration Element:
XXX micron
Filter area
3 X 0.45 m
2
= 1.35 m
2
3 X 0.60 m
2
= 1.80 m
2
Inlet/Outlet diameter
DN200 – DN300 (8” – 12”)
Filter housing
610mm (24”)
Weight: empty/Operation
990kg (2183lb)/1400kg (3086lb)
1050kg (2,240lb)/1540kg (3,390lb)
c. Flushing Data
Exhaust valve
DN80 (3”)
Flushing cycle time
15 – 25 Seconds
Reject water volume per flush cycle
210 liter (55 gallon)
270 liter (72 gallon)
Minimum flow for flushing
30 m
3
/hr (132 gpm)
40 m
3
/hr (176 gpm)
d. Control AND Electricity
Control voltage
24 VDC
Electric motor
0.55 kW
Rated operation Voltage
3 phase, 230/400/460 VAC 50/60 HZ
Current consumption
1.4A
e. Construction Materials
Filter Housing & Lid
Epoxy coated fabricated carbon steel
Shell & Nozzle-Flanges
Epoxy coated fabricated carbon steel
Nozzle-Neck
Epoxy coated fabricated carbon steel
Screens
St.St. 316L
Cleaning mechanism
St.St. 316L and polymeric materials
f. Standard Filtration Degrees
Stainless Steel Weave-wire Screen
micron 500
300
200
130
100
80
50
40
30
10
mm
0.5
0.3
0.2
0.13
0.1
0.08
0.05
0.04
0.03
0.01
Summary of Contents for Omega 13.5K
Page 2: ......
Page 5: ...3 Safety Instructions ...
Page 10: ...4 Technical Specifications ...
Page 12: ...5 Drawings ...
Page 18: ......
Page 19: ...6 Description of Filter Operation ...
Page 23: ...7 Control Philosophy ...
Page 31: ...8 Installation Instructions ...
Page 35: ...9 Commissioning Start up and First Operation ...
Page 38: ...10 Part Schedule ...
Page 52: ...11 Maintenance ...
Page 88: ...12 Troubleshooting ...
Page 90: ...13 Amiad Limited Warranty ...