![amiad BMF Series Installation, Operation And Maintenance Instructions Download Page 49](http://html.mh-extra.com/html/amiad/bmf-series/bmf-series_installation-operation-and-maintenance-instructions_2932258049.webp)
2 - Maintenance
Maintenance must be carried out by repair shops authorized
by WEG.
Repair shops and people without WEG’s authorization who
will perform any service or hazardous location motors will be
fully responsible for such service as well as for any
consequential damage.
THE INSTALLATION OF HAZARDOUS LOCATION
MOTORS MUST BE CARRIED OUT BY SKILLED
PEOPLE, AND THE THERMAL PROTECTION
MUST BE ALWAYS INSTALLED, EITHER INSIDE
OR OUTSIDE THE MOTOR, OPERATING AT THE
RATED CURRENT.
ANY ELECTRICAL OR MECHANICAL
MODIFICATION MADE ON HAZARDOUS
LOCATION MOTORS WILL VOID THE
CERTIFICATION.
DO NOT REUSE DAMAGED OR WORN PARTS.
REPLACE THEM BY NEW ONES SUPPLIED BY
THE FACTORY.
When performing maintenance, installation or relubrication,
follow these instructions:
9
Check if all components are free of edges, knocks or dirt.
9
Make sure all parts are in perfect conditions.
9
Lubricate the surfaces of the endshield fittings with protective
oil to make the assembly easier.
9
Use only rubber hammer to fit the parts.
9
Check for correct bolts tightening.
9
Use clearance calibrator for correct T-box fitting (smaller
than 0.05mm).
Summary of Contents for BMF Series
Page 17: ...Rev 10 2017 BMF Pre Engineered Skid IOM 17 PUMP CURVES ...
Page 18: ...Rev 10 2017 BMF Pre Engineered Skid IOM 18 ...
Page 19: ...Rev 10 2017 BMF Pre Engineered Skid IOM 19 ...
Page 20: ...Rev 10 2017 BMF Pre Engineered Skid IOM 20 ...
Page 21: ...Rev 10 2017 BMF Pre Engineered Skid IOM 21 ...
Page 22: ...Rev 10 2017 BMF Pre Engineered Skid IOM 22 ...
Page 23: ...Rev 10 2017 BMF Pre Engineered Skid IOM 23 ...
Page 24: ...Rev 10 2017 BMF Pre Engineered Skid IOM 24 ...
Page 34: ...Rev 10 2017 BMF Pre Engineered Skid IOM 34 Appendix 1 Pump IOM ...
Page 35: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR ELECTRIC MOTORS Frames 143 5T 586 7T ...