![amiad ADI-X IOM Installation, Operation & Maintenance Instructions Manual Download Page 72](http://html.mh-extra.com/html/amiad/adi-x-iom/adi-x-iom_installation-operation-and-maintenance-instructions-manual_2932245072.webp)
Amiad Water Systems - ADI-X IOM 910101-001180 / 06.2021
72
5.6
Manual Flushing
Manual flushing can be performed manually via
ADI-X
controller panel, or remotely via
ADI-X
Desktop
application,
ADI-X Mobile
application, and
ADI-BLE Mobile
application.
To initiate manual flushing using the ADI-X controller panel:
1.
Open the
ADI-X
protection cover.
2.
If needed, Press the left button to enable LED backlight.
3.
Press the right button (short press). The flushing will start.
Figure 63: ADI-X controller control panel
Right button