2
II. INSTALLATION REQUIREMEN
A.
TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Carpenter’s Chalk
Hammer
Screw Sets
Level Bar
Tape Measure (7.5m)
English Spanner (12")
Pliers
Wrench Set
Lock Wrench
(10
#
, 12
#
, 13
#
, 14
#
, 17
#
, 19
#
, 24
#
, 30
#
)
Ratchet Spanner With Socket (28
#
)
Socket Head Wrench
(3
#
, 5
#
, 6
#
)
Fig. 2
Summary of Contents for PRO-18A
Page 1: ...FOUR POST LIFT Model PRO 18A ...
Page 9: ... 7 D Install cross beams See Fig 11 Fig 12 Fig 11 Fig 12 2 Hole towards inside 1 3 3 ...
Page 23: ... 21 P Install spring and safety cover of cross beam See Fig 32 Fig 32 3 3 3 8 40 3 2 ...
Page 26: ... 24 CROSS BEAM CYLINDERS Fig 35 Fig 36 3 ...
Page 27: ... 25 MANUAL POWER UNIT Fig 37 Manual 220V 60Hz 1PH ...
Page 34: ... 32 ...
Page 37: ... 35 ...