background image

 

25 

 
4

220V Wire connection and circuit diagram

 

4.1 Wire connection diagram in the control box (See

 Fig. 33) 

 

 

 

 
 
 
 
 
 

 

4.2    Wire connection of single phase hydraulic power unit( See 

fig.34

)

   

 

Motor wire (M1

M2) separately connected to two terminals in the control box

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 

Fig.33 

Fig.34 

M1 

M2 

Earth 
wire 

Power 
source 
wire 

 

Solenoid 
valve wire 

 

Motor wire 

Earth 
wire 

 

Low 
limit 
switch   

High 

limit 

switch 

 

Summary of Contents for A435-P

Page 1: ...Model A435 P Fig 1 FOUR POST PARKING LIFT...

Page 2: ...uct Features and Specifications 1 II Installation Requirement 2 III Steps of Installation 3 IV Exploded View 30 V Test Run 35 VI Operation Instruction 36 VII Maintenance 37 VIII Trouble Shooting 37 IX...

Page 3: ...both side front or rear Non skid diamond platforms and adjustable safety lock ladders Optional kits Sliding jack with hand pump caster kits Jack tray Plastic oil tray MODEL A435 P SPECIFICATIONS Mode...

Page 4: ...ch set 12 13 14 15 17 19 24 30 B SPECIFICATIONS OF CONCRETE See Fig 3 Specifications of concrete must be adhered to the specification as following Failure to do so may result in lift and or vehicle fa...

Page 5: ...minimum The source cable size must be 2 5mm and in good condition of contacting with floor III STEPS OF INSTALLATION A Check the parts before assembly 1 Packaged lift and Hydraulic Power Unit See Fig...

Page 6: ...the offside platform take out the parts inside the powerside platform then remove the package stand 5 Move aside the parts and check the parts according to the shipment parts list See Fig 7 Shipment...

Page 7: ...5 6 Open the carton of parts and check the parts according to the parts box list See Fig 8 7 Check the parts of the parts bag according to the parts bag list See Fig 9 Fig 8 Fig 9...

Page 8: ...able 1 Make sure the size is right and base is flat see Fig 10 Note Reserve appropriate space in front and behind the installation site MODEL A B C A435 P 4400mm 173 1 4 2784mm 109 5 8 5207mm 205 B A...

Page 9: ...eam s slot should be positioned towards inward and the safety locks connecting assy should be adjacent to the power unit column Hole towards inside Fig 11 Fig 12 3 6 The powerside column need to be in...

Page 10: ...o they are at the same position Then insert the safety ladder See Fig 13 Safety ladder Limited Pin Limited Pin Fig 13 Safety Ladder is inserted between Limited Pins of the cross beam Insert the safety...

Page 11: ...dders should be the same Fig 14 Fig 15 Lift both cross beams to the same height The safety device on the cross beam should be engaged in the safety ladders at the same height Safety ladder pass throug...

Page 12: ...into the cross beams slots see Fig 16 Tighten the Powerside Platform to the Cross beams by using bolts Illustration for rear pulley in powerside platform Offset the cross beam lean outward when puttin...

Page 13: ...elow is the instruction for the drive in position on cross beam B If it is chosen to be driven in from cross beam A install the tire stop plate to the other side only 2 Powerside column can be install...

Page 14: ...just with shims See Fig 18 Fig 18 4 Level bar Note DO NOT completely tighten the limit slide blocks Loosen 1 4 lap after tightening 33 9 10 32 29 30 31 Install the platform strengthen bolts 34 Slip th...

Page 15: ...ow and then connect them to the columns See Fig 19 NO Cable 1 2 3 4 Length inc connecting fitting 2940mm 115 7 8 8535mm 336 4350mm 171 1 4 7120mm 280 A B C D A C D B Cable installation Instruction Fig...

Page 16: ...es through the cross beam to column top plates and tightened with cable nuts See Fig 20 Fig 20 Cable goes through top plate and tightened with cable nuts Cable goes through the cross beam pulley and t...

Page 17: ...3 Illustration for cables under platform See Fig 21 39 Cable 4 Cable 2 Cable 2 Cable 1 Cable 4 Cable 3 Cable 1 Cable 2 Cable 4 Cable 2 Cable 3 Cable 4 Hex Bolt M10 120 Cable 4 Cable 2 Fig 21 limit blo...

Page 18: ...ss beam A B According to the above diagram fix lock release handle and the safety lock connecting assy with M8 35 bolts and washers on cross beam A Install extend lock release handle and plastic ball...

Page 19: ...e safety release handle 1 Install Power unit on the cross beam A Cross beam B Cross beam A View A Fixing plate Fig 23 10 46 9 47 201 Drive in direction 40 41 40 42 Fix the connecting tube and the conn...

Page 20: ...5 Note Oil hoses connected to oil cylinder must be passed above the cable and oil inlet port should be inclined upwards to avoid the oil hose scratched by cable Drive in direction 40 41 40 Cross beam...

Page 21: ...ut accordingly when installation Retainer 55 54 53 Fig 25 48 4 55 49 50 55 50 51 52 a b c d a b c d Oil return hose Oil inlet port inclined upwards Oil return hose passed above the cable 52 a b c d Fi...

Page 22: ...ss beam goes to highest place the cross beam slide block touched the high limit switch drive bar and the lift stop rising When the cross beam lower to 520mm from ground the cross beam slide block touc...

Page 23: ...12 NC of limit switch to terminals 3 5 of control box 1 Wire connecting for high limit switch 2 Wire connecting for low limit switch wire 1 2 90 Connect limit switch 11 12 terminal to control box 1 2...

Page 24: ...ith retainer tie the wire with protective hose by the cable ties 2 Adjusting the current rating of thermal relay in control box according to the different configurations of hydraulic power unit In gen...

Page 25: ...nnection and circuit diagram 3 1 Wire connection diagram in the control box See Fig 30 Fig 30 Using cross screwdriver to adjust rated current value of thermal relay Fig 29 This point shows the present...

Page 26: ...ram See Fig 32 380V Circuit component Item Name Code Specification Item Name Code Specification 1 Power switch QS 380V AC 8 Lowering alarm button K duplex 2 Fuse FU1 25A 9 Motor M 3 phase 3 Fuse FU2 3...

Page 27: ...ol box See Fig 33 4 2 Wire connection of single phase hydraulic power unit See fig 34 Motor wire M1 M2 separately connected to two terminals in the control box Fig 33 Fig 34 M1 M2 Earth wire Power sou...

Page 28: ...QS 380V AC 8 Lowering alarm button K duplex 2 Fuse FU1 25A 9 Motor M Single phase 3 Fuse FU2 3A 10 Transformer TC 24V AC 4 AC contactor KM 24V AC 11 Limit switch SQ1 SQ2 10A 5 Solenoid valve Y 24V AC...

Page 29: ...onal jack tray and optional plastic oil pans See Fig 37 According to the below diagram screw the M16 30 bolts then attach the drive in ramp Fig 36 59 57 58 60 7 Attach the drive in ramp with the bolts...

Page 30: ...g the vehicle on the lift take off the drive in ramp install rear wheel stop plates to the drive in ramp position Q For optional kits installation 1 Install optional caster kits or jack See Fig 39 76...

Page 31: ...stall the anchor bolts Tap the anchor bolts into the anchor hole with a hammer and tighten the bolts See Fig 43 78 Motor fixing bracket on the side of cross beam A Fig 40 Motor fixing bracket on the s...

Page 32: ...30 IV EXPLODED VIEW 1 Fig 44 Model A435 P 200 3 2 4 7 9 12 13 15 14 11 10 5 6 8 22 8 21 20 19 23 19A...

Page 33: ...31 CROSS BEAM Control box 3 Fig 46 Fig 45...

Page 34: ...32 CYLINDERS SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 48 Fig 47 Fig 48...

Page 35: ...valve for SPX PEAK hydraulic power unit a SPX Electric power unit 220V 50HZ Single phase See Fig 51 Capacitor Oil return port Auxiliary hole Oil Outlet Solenoid valve Check valve Relief valve Auxiliar...

Page 36: ...tle valve Start capacitor Running capacitor Check valve Oil outlet Oil return port Solenoid valve Relief valve Throttle valve Check valve b PEAK electric power unit 220V 50HZ 1 phase See Fig 52 C PEAK...

Page 37: ...and down for several times meanwhile do the synchronous adjustment till the four safety devices can lock and release at the same time 5 Adjust the clearance between the column and the slide block of c...

Page 38: ...ving operator in lift area 2 Press button UP and rise the lift for 3 5 seconds then pull down the safety release handle make sure the safety device released and then keep pressing the safety release h...

Page 39: ...or burned out 1 Replace button 2 Repair all wiring connections 3 Repair or replace motor 4 Replace AC contactor Motor runs but the lift is not raised 1 Motor runs in reverse rotation 2 Release valve i...

Page 40: ...0 420019 Electro power unit 1 17 420175A Hex nut 16 18 410022 Safety ladder 4 19 420022A Pulley pin assy 2 19A 410106 Cushion cover 1 20 420023A Washer 13 21 420024B Pulley 10 22 209034 Lock washer 10...

Page 41: ...1 52 207026 Oil hose 1 53 209060 900 Fitting for power unit 1 54 420095 Straight fitting 1 55 410028 Oil return hose 1 56 410036 Protective hose 1 57 209145A Cup head bolt with washer 8 58 410029 Plas...

Page 42: ...A 217020 Bronze bush 2 3 3 410099 Spring 2 3 4 410031 Connecting bar for safety lock 2 3 5 206023 Self locking Nut 4 3 6 410032 Safety locks connecting assy 2 3 7 410033 Connecting bar assy for safety...

Page 43: ...1 67 2 201094 Power Indictor 1 67 3 420070 Button UP 1 67 4 420070 Button Down 1 67 5 420139 Screw 4 67 6 420074 Power Switch QSI 1 67 7 420085 Fuse Cap 3 67 8 420086 Fuse FU1 3 67 9 420087 Fuse Base...

Page 44: ...4 200 11 81400093 Reservoir 1 200 12 81400166 Cross Bolt 2 200 13 81400167 Cover for Capacitor 1 200 14 81400029 Capacitor 1 200 15 81400168 Rubber Gasket 1 200 16 81400169 Hex Bolt 1 200 17 81400062...

Page 45: ...400024 Reservoir 1 200A 13 420148 Cup Head Bolt 4 200A 14 81400066 Cover for Capacitor 2 200A 15 81400130 Start Capacitor 1 200A 15A 81400088 Run Capacitor 1 200A 16 81400180 Rubber Gasket 2 200A 17 4...

Page 46: ...81400144 O ring 1 200B 10 81400150 Filter 1 200B 11 81400145 Socket Bolt 4 200B 12 81400024 Reservoir 1 200B 13 420148 Cup head Bolt with washer 2 200B 14 81400050 Cover of Motor Terminal Box 1 200B 1...

Page 47: ...45 72113101 12 2015...

Reviews: