VII. MAINTENANCE SCHEDULE
Monthly:
1. Re-torque the anchor bolts to 150 Nm;
2. Check all connectors, bolts and pins to insure proper mounting;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage;
5. Check safety device and make sure proper condition;
6. Lubricate all rollers and pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the bolts does not function for
any reason, DO NOT use the lift until the bolt has been replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust as necessary, equalizer tension of the cables to insure level lifting.
3. Check columns for plumbness.
4. Check rubber pads and replace as necessary.
5. Check safety device and make sure proper condition.
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...