- 6 -
3. Remove aside the top beam assy.
(See Fig. 9).
4. Lift the upper column with a fork lift or hoist, loosen the bolts of the upper package
stand, take off the upper outer column, then take out the parts in the inner column
(See
Fig. 10).
5. Lift the lower column with a fork lift or hoist, take down the package stand, than take
off the lower outer column, take out the parts in the inner column
(See Fig. 11).
Fig. 9
Fig. 10
Fig. 11
Open the package
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...