Local Operation
3-8
TM-F2OP-C1XN-01
7. To check that the power supply shuts off at the desired set point,
slowly increase the output voltage while monitoring the front panel
voltmeter. The OVP LED on the front panel turns on when the OVP
circuit activates.
Resetting the OVP Circuit
To reset the OVP circuit after it activates:
1. Reduce the power supply’s output voltage setting to below the OVP
set point.
2. Press the STANDBY switch IN. The red S/D LED on the front panel
turns on. The OVP LED turns off.
3. Press the STANDBY switch again to return power to the load and
resume normal operation.
OR
1. Reduce the power supply’s output voltage setting to below the OVP
set point.
2. Turn the power supply OFF using the AC power switch, wait until the
front panel displays go out, then turn the power supply back ON
again.
Summary of Contents for Sorensen XFR 100-28
Page 3: ...This page intentionally left blank ii...
Page 5: ...This page intentionally left blank iv...
Page 7: ...This page intentionally left blank vi...
Page 13: ...xii...
Page 15: ...xiv...
Page 25: ...1 10...
Page 67: ...3 18...
Page 73: ...Remote Operation 4 6 TM F2OP C1XN 01 Figure 4 1 Connecting Programming Sources to J2 Connector...
Page 75: ...4 8...
Page 87: ...5 12...