6
COOLANT
OUT
51
CENTER DIVIDER
67
1/4" COPPER
1
IN
COOLANT
WATER
IN
1
47
2
66
3
3
6
52
32
CENTER DIVIDER
65
28
3
50
5
11
PUMP
20
3
56
PUMP
REGULATOR
14
7
7
57
3
3
AIR IN
4
WATER
OUT
60
1
1
54
23
62
61
31
35
PRESSURE
RELEASE
45
49
37
LEFT
CYLINDER
10 12
9
13
10 12
8
34
31
FRONT
PANEL
42
17
1/4" COPPER
68
LEFT CYLINDER
15
16
40
18
-02
33 -02
40
41
LEFT CYL
44
3
PUMP PRESS
19
17
1/8" SS
15
16
40
18
40
18
30
47
PRESSURE
RELIEF
24
20
3
2
64
63
RELIEF VALVE
31
21
41
43
48
RIGHT CYLINDER
19
17
40
42
15
16
18
-02
33 -02
31
21
34
8
FRONT
PANEL
10
12
9
13
12
10
RIGHT CYLINDER
36
CENTER DIVIDER
32
46
3
1
32
2
40
53
59
40
11
A
1
A
10
9
8
9
7
H
6
5
4
G
3
H
2
G
12
11
10
07-28-08
SHEET 2 OF 2
TITLE BLOCK REV 3
CHANDLER ENGINEERING
SIZE D
REV AA
PIPING DIAGRAM,DUAL UCA
07-28-08
07-28-08
PROJ:
PN: 84-0007
THIRD ANGLE PROJECTION
SURFACE FINISH 63 RMS
ENGR: MJ
MFG: TC
STRUCT:
TYPE:
DRAWN: TC
1/2
COMPANY LLC
1
D
F
C
B
E
2
3
5
6
7
8
4
B
C
D
E
F
BREAK EDGES, DEBURR
UON DIMS ARE IN INCHES
1 PLC
0.030 2 PLC 0.010
3 PLC
0.005 ANGL
THIS DOCUMENT AND THE DRAWINGS AND
TECHNICAL DATA CONTAINED HEREON ARE THE
PROPERTY OF CHANDLER ENGINEERING COMPANY
LLC. REPRODUCTION OR DISSEMINATION IN ANY
FORM EXCEPT AS EXPRESSLY AUTHORIZED BY THE
OWNER IS FORBIDDEN. THE HOLDER AGREES TO
RETURN THE DOCUMENT TO THE OWNER ON
DEMAND. COPYRIGHT BY CHANDLER ENGINEERING
12
Summary of Contents for CHANDLER ENGINEERING Twin UCA 4262
Page 6: ...P 2 PREFACE This page is intentionally left blank...
Page 10: ...1 4 SECTION 1 INSTALLATION This page is intentionally left blank...
Page 20: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Page 24: ...3 4 SECTION 3 MAINTENANCE AND SERVICING This page is intentionally left blank...
Page 28: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Page 32: ......
Page 33: ...CHANDLER ENGINEERING...
Page 34: ......
Page 37: ......
Page 38: ...CHANDLER ENGINEERING...
Page 39: ......
Page 40: ...CHANDLER ENGINEERING...