MRO2X
– 5X Manual
- 37 -
98-0058
Rev. R
SECTION 8, MAINTENANCE
WARNING: If any component of the water treatment system is changed or replaced, the
user should conduct appropriate tests to ensure that the revised system
meets all standards to which it was initially tested.
WARNING: Maintenance shall be performed by qualified personnel only.
8.1
MAINTAINING THE SYSTEM
1. AmeriWater has provided a Startup Log for the MRO system. This must be filled out
completely each time the system is used. The recorded information may be useful in
troubleshooting problems encountered with the MRO. Please see the Startup Log in
Section 4.
2. The MRO system will need to be disinfected regularly. The frequency is determined by the
usage of the system. If the MRO system is being used every day, it should be disinfected
monthly. If the system is being used on an "as needed" basis, with 1 or more days between
uses, then it should be “packed” in BioTrol or disinfected before each use.
3. Bacteria and L.A.L. (Limulus Amebocyte Lysate) testing is required monthly and AAMI
testing is required annually.
4. Selection of water equipment for dialysis is the responsibility of the dialysis physician
(medical director). A water sample should be sent to a lab yearly for a complete AAMI water
analysis to ensure that the product water meets AAMI standards.
5. MRO System product water quality is dependent on input water quality. Actual product
water quality may vary substantially from the value for specified input water. The expected
results for the user's water can only be verified on the basis of analysis of the user's water.
If there are variations in the input water or changes detected in the output water, contact
AmeriWater immediately.
6. Monitoring of the water bacteriology of the system following installation is the responsibility
of the user. Total viable microbial counts shall not exceed the AAMI standard for bacterial
colony forming units per milliliter (CFU/ML) or endotoxins measured in endotoxin units (EU).
See instructions for proper disinfection of the system in Section 5.
7. The accuracy of the Conductivity display should be verified with a calibrated, hand-held
meter at least annually. If the conductivity display is not within 5% of the hand-held meter
readings, the controller should be calibrated in accordance to the procedures in Section 6.3.
Conductivity may also be verified each time an AAMI analysis is done by noting the
conductivity readings when the AAMI sample is drawn and verifying the reading with the
AAMI results.
Summary of Contents for MRO2X
Page 2: ......
Page 9: ...MRO2X 5X Manual 5 98 0058 Rev R SECTION 3 COMPONENTS AND SCHEMATICS 3 1 EXTERNAL FRONT VIEW ...
Page 11: ...MRO2X 5X Manual 7 98 0058 Rev R 3 2 INTERNAL REAR VIEW ...
Page 13: ...MRO2X 5X Manual 9 98 0058 Rev R 3 3 ELECTRICAL DIAGRAM MRO2X MRO3X MRO4X MRO5X ...
Page 14: ...MRO2X 5X Manual 10 98 0058 Rev R 3 4FLUID DIAGRAM MRO2X MRO3X MRO4X ...
Page 15: ...MRO2X 5X Manual 11 98 0058 Rev R 3 5 FLUID DIAGRAM MRO5X ...
Page 35: ...MRO2X 5X Manual 31 98 0058 Rev R FIGURE 6 2 ...
Page 36: ...MRO2X 5X Manual 32 98 0058 Rev R FIGURE 6 3 ...
Page 52: ...MRO2X 5X Manual 48 98 0058 Rev R SECTION 11 SPARE PARTS LISTING ...