MAINTENANCE
LAB STORAGE TANKS
22
98-0123 Rev E
9.2
UV Quartz Sleeve Cleaning / Replacement
Drain the chamber by
using the drain port.
Remove the bottom
retaining nut, floating
spring, and O-ring.
Remove the top retaining
nut and O-ring.
Carefully, remove O-ring
adhering to the quartz
sleeve.
Remove the quartz
sleeve.
Clean the quartz sleeve
with a cloth soaked in
CLR, vinegar or some
other mild acid and then
rinse with water.
Note: If sleeve cannot be
cleaned completely or it is
scratched or cracked,
then replace the sleeve.
Reinstall the quartz
sleeve in the chamber
allowing the sleeve to
protrude an equal
distance at both ends of
the chamber.
Slide supplied O-rings
onto each end of the
quartz sleeve.
Reinstall the top and
bottom retaining nuts,
floating spring, and O-
rings respectively. • When
service is complete,
assemble the
prerequisites in the
reverse order of
disassembly.
Plug in controller and
verify the POWER-ON LED
display is illuminated and
controller power-up
sequence operates.
Push the lamp connector
against lamp connector
base together until an
audible click is heard.
Re-pressurize the system
to check for leaks.
Summary of Contents for 00HC-4090
Page 2: ......
Page 7: ...COMPONENT IDENTIFICATION LAB STORAGE TANKS 5 98 0123 Rev E 2 COMPONENT IDENTIFICATION...
Page 8: ...COMPONENT IDENTIFICATION LAB STORAGE TANKS 6 98 0123 Rev E...
Page 9: ...COMPONENT IDENTIFICATION LAB STORAGE TANKS 7 98 0123 Rev E 2 1 Flow Schematic...
Page 15: ...OPERATION LAB STORAGE TANKS 13 98 0123 Rev E Figure 3 Grundfos Eye Indicators...
Page 16: ...OPERATION LAB STORAGE TANKS 14 98 0123 Rev E 5 2 Default Pump Program...
Page 28: ...REPLACEMENT PARTS LAB STORAGE TANKS 26 98 0123 Rev E 11 REPLACEMENT PARTS...