Note:
Install Optional Sweat Adapter (Supplied) for
copper pipe supply line.
1.
Measure the distance (
A
) from the finished wall to the
center of the inlet spud on the fixture.
2.
Cut the supply pipe 1-1/4” (
A-B=C
) shorter than the
measurement taken in Step 1. File any rough edges
off the end of the supply pipe.
3.
Clean the end of the supply pipe. Push the threaded
Adapter until it is seated against the internal stop.
Sweat the Adapter to the pipe.
CENTER LINE OF
FIXTURE SPUD
FINISHED WALL
FILE EDGES
SOLDER
ADAPTER
ADAPTER
32mm
(1-1/4")
A
(A-B)=
B
C
CLEAN
1
INSTALL SWEAT ADAPTER
F
2
INSTALL COVER TUBE, WALL ESCUTCHEON AND STOP VALVE
Turn off hot and cold water
supplies before beginning.
Fig. 4a
Fig. 4b
Fig. 4c
1
1
4
2
3
TEFLON TAPE
FINISHED WALL
X
X
2
FLUSH VAVLE INSTALLATION
1.
Measure from finished wall to first thread of Adapter
or threaded supply pipe (dimension “X”). Cut
COVER TUBE (
1
) to length (
X
). Apply Teflon Tape to
the threaded end of the Adapter or supply pipe.
2.
Push WALL ESCUTCHEON (
2
) onto the COVER
TUBE (
1
). Slide both onto the SUPPLY PIPE (
3
).
3.
Push the COVER TUBE (
1
) in to expose the threads
of the supply pipe. With a wrench thread the STOP
VALVE (
4
) onto the SUPPLY PIPE (
3
). Align and
tighten.
4.
Pull COVER TUBE (
1
) against STOP VALVE (
4
) and
push WALL ESCUTCHEON (
2
) against finished wall.
G
I
D
E
A
C
D
F