![American Standard QR031 Owner'S Manual Download Page 10](http://html1.mh-extra.com/html/american-standard/qr031/qr031_owners-manual_2929927010.webp)
10
Installation
1
Drilling the pilot holes
- Draw a vertical line (1) on the supporting wall up to the
ceiling, or as high as practical, at the center of the area in
which the hood will be installed .
- Draw a horizontal line (2) at 18 in . (458 mm) above an
electric stove or 29 .5 in . (750 mm) above a gas stove .
- Place the chimney support bracket (E) on the wall about
0 .8 in . (20 mm) from the ceiling or upper limit, aligning the
center notch with the vertical reference line (1) . Mark the
wall at the center of the holes in the bracket (E) .
- Place the hood brackets (D) on the wall, aligning their
center notches 11 .2 in . (284 mm) above the horizontal line
(2) and 5 .36 in . (136 mm) apart . Mark the wall at the center
of the holes in the bracket .
- Drill pilot holes at the marked locations .
2
Installing the toggle bolts and
chimney support bracket
- Screw the four toggle bolts (DD) into the wall, leaving the
head of the bolts approximately 0 .25 in . (6 .4 mm) away
from the wall surface .
- Place the chimney support bracket (E) over the upper
toggle bolts (DD) . Tighten securely .
3
Attaching the hood brackets
- Attach the two hood brackets (D) to the back of the range
hood (A) with the four screws (AA) and washers (BB) .
A
AA
BB
D
A
3
4
3
Wall