STEP 4: APPLYING SEALANT FOR SEAMS AND JOINTS

1)  

Once all panels are securely in place and set, apply the  
tub and tile sealant to all corners, seams between panels 
and gaps between bottom panels and shower base. 

 

(Illustration 6)

  

NOTE:  Wipe any excess adhesive from the panel 

with damp cloth.

 

 

Allow 24 hours for the sealant to dry before use. 

 

Illustration 6

STEP 3: INSTALLING SIDE WALL PANELS

1)  

Orient side panel to match subway tile design  
of top rear panel.

2)  

Align grout lines of side panels with rear wall panel  
grout lines. Trim side panels if needed to fit within alcove 
area. 

(Illustration 4)

 

  

Trim or cut from bottom edge of side panels so that the  
top edge of the panels are level with the top edge of  
the back panels. 

Tri mming  Panels:

 

a)  Measure shower enclosure.

b)   Apply masking tape to approximate cut area on the tile 

finished side to prevent chipping and protect surface.

c)  Transfer measurement to panel.

d)   Using a jigsaw with a fine tooth blade, cut along line on 

finished tile side. Ensure a new blade is used.

3)  

Once both side panels are properly dry fitted, mark all  
panels and trim as needed: 

  a) Apply tape to approximate location

  b) Mark all plumbing locations 

  c)  Drill holes at each location using hole saws large enough 

to accomomdate the opening but small enough to be 
covered by the trim plates. 

(Illustration 5)

NOTE: Drill from finished tile side.

 

          Do not use wood/paddle bits or grit hole saws as  

 they will chip.

 

4)

  Wipe panels and walls with a damp cloth to remove any  

dust or debris. Allow to fully dry. 

5)

  Apply 1/4" (6mm) bead of adhesive on the substrate in  

evenly spaced vertical strips every 6" (152mm) for each  
panel, top to bottom. 

(Illustration 3)

 Apply one row of 

adhesive horizontally to the top and bottom edges of the 
substrate. 

(Illustration 3)

 Place wall into place and press 

firmly over entire surface to ensure adhesion. Wipe off 
excess adhesive with a damp cloth. 

6)

 Repeat on second wall panel.

SHOWER VALVE

Illustration 4

Illustration 5

CORRECT

PANEL POSITION

TOP REAR PANEL

RIGHT SIDE PANEL

TOP REAR PANEL

RIGHT SIDE PANEL

REAR CORNER

INCORRECT

PANEL POSITION

REAR CORNER

GROUT

LINES

- 3 -

Summary of Contents for Passage Subway P2969SWT

Page 1: ...truction Adhesive x2 Tubes Tub Tile Sealant BEFORE YOU BEGIN Local building codes vary by location Observe all local plumbing and building codes Unpack your new shower walls and inspect them carefully...

Page 2: ...fully dry 3 Starting with the bottom rear back panel first apply 1 4 6mm bead of adhesive on the substrate in evenly spaced vertical strips every 6 152mm for each panel top to bottom Apply one row of...

Page 3: ...ooth blade cut along line on finished tile side Ensure a new blade is used 3 Once both side panels are properly dry fitted mark all panels and trim as needed a Apply tape to approximate location b Mar...

Page 4: ...ssories American Standard s limited warranty on these items is one year for parts only and excludes labor This one year limited warranty covers accessories manufactured by American Standard e g aprons...

Page 5: ...R Le code du b timent varie selon la r gion Respectez les codes de plomberie et du b timent de votre r gion D ballez vos murs de douche et inspectez les minutieusement pour v rifier s ils sont en bon...

Page 6: ...cer avec le panneau arri re du bas appliquez des cordons d adh sif de 1 4 po 6 mm sur le mat riel de base en tra ant des rayures quidistantes tous les 6 po 152 mm pour chaque panneau de haut en bas Ap...

Page 7: ...la ligne du c t fini des carreaux avec une scie sauteuse et une lame dents fines Utilisez une lame neuve 3 Apr s avoir bien install les deux panneaux lat raux marquez tous les panneaux pet d coupez le...

Page 8: ...et accessoires La garantie limit e d American Standard couvrant ces articles est d un an pour les pi ces seulement et ne couvre pas la main d oeuvre Cette garantie limit e d un an couvre les accessoi...

Page 9: ...ducha y f jese atentamente que no est n da adas Verifique que las paredes sean del tama o correcto para su instalaci n NOTA Tenga mucho cuidado al manipular las superficies frontales de las paredes Us...

Page 10: ...en por completo 3 Comenzando en primer lugar con el panel posterior trasero inferior aplique una gota de adhesivo de 1 4 6mm sobre el sustrato en tiras verticales espaciadas uniformemente cada 6 152 m...

Page 11: ...caladora con hoja de dientes finos corte a lo largo de la l nea en el lado acabado del azulejo Aseg rese de que se use una hoja nueva 3 Una vez que ambos paneles laterales se ajusten correctamente en...

Page 12: ...rant a limitada de American Standard sobre estos art culos es de un a o para las piezas nicamente y excluye la mano de obra Esta garant a limitada de un a o cubre los accesorios fabricados por America...

Reviews: